Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award
    Sustainability

    Galliford Try’s £110M River Mease project: geotechnical notes for engineers

    September 7, 2026|

    Reviewed by Joe Ashwell

    Galliford Try’s £110M River Mease project: geotechnical notes for engineers

    First reported on New Civil Engineer

    30 Second Briefing

    Galliford Try’s environment business has secured a £110M contract from Severn Trent Water to deliver the River Mease improvement project, targeting water quality upgrades on the protected River Mease catchment in the Midlands. Works are expected to centre on wastewater treatment enhancements, sewer network upgrades and nature-based solutions to cut nutrient loading into this Special Area of Conservation. The scale of the programme signals significant opportunities for geotechnical input on riverbank stabilisation, outfall structures and construction in sensitive, high-groundwater environments.

    Technical Brief

    • Contract value fixed at £110M, indicating a multi-year, multi-asset programme rather than isolated upgrades.
    • Appointment at this stage suggests early contractor involvement on constructability, access planning and in-river working methods.
    • Environmental focus implies tight consents for in-channel works, noise, turbidity and temporary diversions during construction.
    • Multi-site nature likely to require standardised temporary works designs for outfalls, cofferdams and bank stabilisation.

    Our Take

    In our database of 25 Environmental stories, Galliford Try features repeatedly on water and wastewater upgrades (e.g. the Camberley Sewage Treatment Works project for Thames Water), signalling that utilities such as Severn Trent Water are likely drawing on a contractor with recent regulatory-compliance experience for river quality schemes.

    The River Mease improvement project aligns with Galliford Try’s stated expectation of a multi‑year surge in UK water infrastructure spend, suggesting this award is part of a broader pipeline rather than a one‑off environmental commission.

    Galliford Try’s recent use of a green hydrogen fuel cell generator on a National Highways compound indicates that Severn Trent Water may have scope to push for low‑carbon construction methods on the River Mease works, not just ecological outcomes in the watercourse itself.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    ScottishPower wind farm decommissioning: circularity lessons for UK designers
    Environmental
    6 days ago

    ScottishPower wind farm decommissioning: circularity lessons for UK designers

    Decommissioning of Scotland’s first commercial wind farm, operated by ScottishPower, is being used as a UK-first testbed to align turbine end-of-life with material reuse and circular economy principles. Analysis of the dismantling process tracks recovery pathways for steel towers, concrete foundations and composite blades, examining options such as onshore recycling, repowering and secondary construction uses. Outcomes will inform future decommissioning strategies for UK wind assets, with direct implications for design-for-disassembly, waste permitting and contractual requirements on recyclability.

    InCapture–Yara Pilbara offshore CO₂ storage: design and risk notes for project teams
    Environmental
    8 days ago

    InCapture–Yara Pilbara offshore CO₂ storage: design and risk notes for project teams

    InCapture and Yara Pilbara Fertilisers have signed a non-binding MoU to evaluate large-scale offshore carbon storage infrastructure for industrial emitters in Western Australia’s Pilbara region. The partners will study technical options for multi-user CO₂ transport and injection, along with regulatory approvals for offshore storage permits and long-term liability. Outcomes could shape future capture hubs for gas, fertiliser and mining operations in the Pilbara, influencing pipeline routing, injection well design and integration with existing process plants.

    Stantec–Niche acquisition: ecology and approvals implications for project teams
    Environmental
    19 days ago

    Stantec–Niche acquisition: ecology and approvals implications for project teams

    Stantec has acquired Sydney-headquartered environmental consultancy Niche and its wholly owned subsidiary Ausecology, expanding its environmental and approvals capability across Australia. Niche brings specialist services in ecology, biodiversity assessment and environmental impact studies for transport, energy and resources projects, complementing Stantec’s existing design and engineering portfolio. The deal signals stronger in-house capacity for early-stage constraints mapping, permitting support and ecological monitoring on major linear infrastructure and mining-related developments in sensitive habitats.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.

    AllGeotechnicalInfrastructureHazardsEnvironmental