Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects

    Fourth quarter output down 2.1%: delivery and cost pressures for UK project teams

    February 12, 2026|

    Reviewed by Tom Sullivan

    Fourth quarter output down 2.1%: delivery and cost pressures for UK project teams

    First reported on The Construction Index

    30 Second Briefing

    Fourth quarter construction output in Great Britain fell 2.1% quarter‑on‑quarter in Q4 2025, with new work down 2.6% and repair & maintenance down 1.5%, driven by a 3.6% drop in private house‑building. Despite this, annual output for 2025 still grew 1.8% versus 2024, while construction output prices rose 2.7% in the 12 months to December. New orders declined 3.8% (£469m) in Q4, mainly in private commercial and industrial work, as developers cited low planning approvals, rising costs and mounting viability pressures, particularly for SMEs.

    Technical Brief

    • December 2025 output fell 0.5% month‑on‑month, following revised drops of 0.8% and 1.6% in November and October.
    • December’s decline came entirely from a 2.5% fall in repair and maintenance, with new work up 1.0%.
    • Construction output prices increased 2.7% in the 12 months to December 2025, squeezing fixed‑price contracts.
    • Total new orders dropped £469m in Q4 2025, driven mainly by private commercial and private industrial sectors.
    • UK real GDP grew only 0.1% in both Q3 and Q4 2025, limiting demand for new private developments.
    • Home Builders Federation reports mounting scheme viability pressures from low planning approvals, rising costs and policy burdens.
    • Hampshire Trust Bank notes SMEs are disproportionately exposed, as planning delays directly constrain cash flow and site turnover.

    Our Take

    With UK GDP only edging up 0.1% quarter-on-quarter while construction output prices are rising 2.7% annually, contractors in Great Britain are likely seeing margin squeeze on fixed-price infrastructure and building contracts signed in 2023–24.

    The £469 million fall in UK construction new orders in Q4 2025 signals a potential soft patch for project pipelines in 2026–27, which in our infrastructure coverage typically translates into fiercer bidding and delayed starts on discretionary private-sector schemes.

    Among the 685 Infrastructure stories in our database, UK-focused pieces increasingly pair ONS data with commentary from lenders such as Hampshire Trust Bank and trade bodies like the Home Builders Federation, indicating that financing conditions and planning policy are now central to interpreting construction output figures.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers
    Infrastructure
    in 10 months

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers

    A 13.46m diameter Herrenknecht Mixshield TBM has broken through into the future Balboa station on Panama Metro Line 3 after completing the first-ever TBM undercrossing of the Panama Canal at depths exceeding 60m below sea level. The 5,600kW, 26,616kNm machine, fitted with an accessible cutterhead and more than 4,500 sensors linked via the Herrenknecht.Connected platform, has achieved peak advance of 150 segment rings (about 300m) per month through mixed sandstone, tuff, breccias and basalt. Around 1.5km of the 4.5km twin-track tunnel remains to final breakthrough.

    Hudson Tunnel funding deadline: schedule and risk takeaways for project teams
    Infrastructure
    in 9 months

    Hudson Tunnel funding deadline: schedule and risk takeaways for project teams

    Federal funding for New York’s US$16bn Hudson Tunnel Project has been frozen, forcing the Gateway Development Commission to suspend works from 6 February after spending over US$1bn and employing about 1,000 site workers. A Manhattan federal judge has issued a temporary restraining order, giving the administration until 5 p.m. on 12 February to restore reimbursements or appeal, while contractors warn that demobilisation, resequencing and remobilisation will add cost and delay. Sites are now in “safe-pause” mode, with dewatering, ground support and environmental monitoring maintained, and assembly of two Herrenknecht TBMs in New Jersey likely to slip beyond the planned spring 2026 launch without funding certainty.

    Implenia/Marti JV MehrSpur Zurich–Winterthur: design and risk notes for engineers
    Infrastructure
    in 5 months

    Implenia/Marti JV MehrSpur Zurich–Winterthur: design and risk notes for engineers

    Swiss Federal Railways has awarded an Implenia/Marti 50:50 joint venture five of six MehrSpur Zurich–Winterthur lots worth just under CHF 1.7 billion, including the 8.3 km Brüttener tunnel (Lot 240) with twin 10 m diameter single-track tubes and a 1 km spur to Zurich Airport. TBM excavation will start in August 2029, with a roughly ten-year construction phase using BIM for planning and execution and extensive special foundations, earthworks and embankments. Additional works cover full redevelopment of Dietlikon station, about 6 km of new track across Dietlikon and Wallisellen sections, multiple underpasses, bridges and the Neumühle railway bridge and Storchen underpass near Winterthur.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.