Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability
    Product

    ExxonMobil–Teck renewable diesel deal: haul fleet implications for mine operators

    June 26, 2026|

    Reviewed by Tom Sullivan

    First reported on International Mining – News

    30 Second Briefing

    ExxonMobil has finalised a supply agreement with Teck for Esso Ethos+ Renewable Diesel R100 in Canada and completed the first delivery to Teck’s Highland Valley Copper (HVC) operations in British Columbia. The 100% renewable diesel will be produced by Imperial Oil’s Strathcona refinery, which is being upgraded to manufacture bio-based fuels for heavy-duty applications such as mine haul trucks and support fleets. For mine operators, the deal signals growing availability of drop-in low-carbon fuels compatible with existing diesel engines and fuel infrastructure.

    Technical Brief

    • Using a drop‑in fuel avoids near‑term capital expenditure on new engines, fuel farms or distribution piping.

    Our Take

    Teck’s use of renewable diesel at the HVC operations in British Columbia aligns with other Teck-linked pieces in our database that focus on extracting more value from existing assets and waste streams, such as the germanium recovery work at Trail Operations with Titan Mining.

    British Columbia’s 2024 mining output, highlighted in our coverage as C$19.6 billion from just 18 mines and two smelters, means any decarbonisation move at a large site like HVC can materially influence the province’s reported sector emissions profile and ESG narrative.

    For ExxonMobil and Imperial Oil’s Strathcona Refinery, locking in an offtake-style renewable diesel supply into August 2025 gives a concrete downstream outlet that may help counterbalance reputational pressure from safety incidents at other ExxonMobil-linked refineries, such as the Esso Fawley LPG leak case in the UK.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 3 hours ago

    Sandvik’s SEK 175m LKAB Malmberget order: flowsheet notes for plant engineers

    Sandvik has secured a SEK 175 million order from LKAB to supply crushing and screening equipment for the new iron ore sorting plant at Malmberget, booked in Q2 2026. The package includes cone crushers, double-deck screens and vibrating feeders, forming the core of the primary and secondary sizing circuit. For plant designers and process engineers, the deal signals continued reliance on high-capacity, fixed crushing lines for Nordic underground iron ore operations rather than modular or fully mobile alternatives.

    Eurasian Resources–BAUER vertical bauxite mining: design and planning notes for engineers
    Mining
    about 3 hours ago

    Eurasian Resources–BAUER vertical bauxite mining: design and planning notes for engineers

    Eurasian Resources Group’s Aluminium of Kazakhstan unit has commissioned BAUER rotary drilling equipment at open pit No. 4 of the Vostochno-Ayatskoye Krasno-Oktyabrskoye bauxite mine to trial what is described as the world’s first vertical bauxite extraction project. The system uses vertical rotary drilling rather than conventional bench blasting and truck–shovel methods, aiming to access deeper ore zones within the existing pit footprint. For geotechnical and mine planners, the approach could alter pit slope design, drilling patterns and ground support requirements if adopted at scale.

    Mining
    about 3 hours ago

    Minim Martap bauxite rail delivery: logistics and design takeaways for engineers

    Delivery of locomotives to Camalco Cameroon S.A marks a key step in Canyon Resources’ mine-to-port logistics build-out for the Minim Martap bauxite project. The rail units will underpin dedicated ore haulage from the mine in Cameroon to port export facilities, supporting the planned production ramp-up and reducing reliance on road trucking. For engineers, the move signals that bulk materials handling, rail integration and port interface design are now on the project’s critical path.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy