    Ero Copper’s Furnas project: 24-year mine NPV and capex lens for planners

    February 25, 2026|

    Reviewed by Tom Sullivan

    Ero Copper’s Furnas project: 24-year mine NPV and capex lens for planners

    First reported on MINING.com

    30 Second Briefing

    Ero Copper’s Furnas project in Pará, Brazil, has delivered a first PEA outlining a 24-year, four-zone operation producing about 1.2 million tonnes of copper, 2 million oz. of gold and 9 million oz. of silver, with average copper-equivalent output of 108,000 tonnes per year over the first 15 years. Using long-term prices of $4.60/lb copper, $3,300/oz gold and $40/oz silver, the study reports an after-tax NPV8 of $2 billion, 27% IRR and initial capex of $1.3 billion (~$16,000/t CuEq). The 2,400-hectare Carajás property, 50 km from Vale’s Salobo mine, carries 275.6 Mt indicated at 0.83% CuEq and 195.9 Mt inferred at 0.76% CuEq from 28,000 metres of Phase 1 drilling.

    Technical Brief

    • Four distinct mining areas are planned within the Furnas project footprint, implying distributed infrastructure and haulage.
    • Vale and Anglo American previously completed 90,000 m of drilling, providing a deep legacy dataset for modelling.
    • Ero’s own work has added 45,000 m of drilling in two phases as sole exploration funder.
    • Current resource estimate is based only on 28,000 m of Phase 1 drilling, leaving Phase 2 unmodelled.
    • The 2,400-hectare property lies ~50 km southeast of Vale Base Metals’ Salobo copper operations in the Carajás province.
    • Ero holds an earn-in right to 60% of Furnas under a 2024 agreement with Vale Base Metals.
    • Indicated resources stand at 275.6 Mt at 0.83% CuEq; inferred at 195.9 Mt at 0.76% CuEq.
    • 2024 PEA is described as the culmination of over a decade of engineering and technical studies on the asset.

    Our Take

    Using the stated 1.2 million tonnes of copper over 24 years, Furnas would average around mid-40 ktpa copper output, which in our database puts it in the mid-tier scale bracket for Latin American copper operations rather than among the Carajás mega-producers such as Salobo in Pará.

    The 8% discount rate and US$4.60/lb copper price assumption used in the Furnas PEA are at the upper end of price decks seen in recent copper project studies in our coverage, suggesting that project economics could be more sensitive to downside price scenarios than some peer feasibility cases.

    Ero Copper’s right to earn a 60% interest at Furnas, combined with an initial capex estimate of US$1.3 billion, implies a substantial funding requirement relative to its roughly US$3.5 billion market capitalisation, which in our database typically leads operators to consider staged development, streaming/royalty structures, or strategic partners for similar Latin American copper–gold builds.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Flexco conveyor reliability tools: key maintenance takeaways for coal mines
    Mining
    about 1 hour ago

    Flexco conveyor reliability tools: key maintenance takeaways for coal mines

    Flexco is using the Queensland Mining & Engineering Exhibition in Mackay to showcase next‑generation conveyor reliability tools for coal operations facing tighter maintenance windows and labour shortages. The company is focusing on fast-install belt cleaners, condition‑monitoring hardware and data platforms that allow remote inspection of idlers, pulleys and splices without shutting down production. For mine operators, the pitch is higher conveyor availability on long overland and plant belts, reduced manual belt-walks, and more predictable shutdown planning in high‑throughput Queensland coal plants.

    Mining
    32 minutes ago

    Tía María Komatsu AHS trucks: haul road and traffic design notes for mine engineers

    Southern Copper’s Tía María greenfield copper project in Arequipa will be the first mine in Peru to operate Komatsu autonomous haulage system (AHS) trucks, supplied and supported by Komatsu-Mitsui. CEO Julio Molina told Día1 de El Comercio that the deployment will use Komatsu’s state-of-the-art AHS platform, signalling a shift towards driverless haul fleets in the country’s large open pits. The move will require detailed redesign of haul roads, traffic management and dispatch systems to meet AHS requirements for berms, gradients and separation from manned equipment.

    Aclara’s Penco rare earths approval: project economics and design notes for engineers
    Mining
    about 1 hour ago

    Aclara’s Penco rare earths approval: project economics and design notes for engineers

    Aclara Resources has secured its Environmental Qualification Resolution for the Penco Module ionic clay rare earth project near Penco, 430 km south of Santiago, concluding a permitting process that ran for more than four years. The project is scoped to produce about 774 tonnes of rare earth oxides annually over 14 years, with a 2021 PEA outlining initial capital of $119 million, an after-tax NPV of $178 million at a 5% discount rate, a 23% IRR and a 4.7-year payback. Penco ore will ultimately feed Aclara’s planned commercial separation plant in Louisiana, supported by a Virginia Tech pilot facility producing both light and heavy rare earth oxides.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy