Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Research
    Sustainability
    Projects

    CREST Hub for critical minerals: separation and flowsheet insights for engineers

    November 23, 2026|

    Reviewed by Joe Ashwell

    CREST Hub for critical minerals: separation and flowsheet insights for engineers

    First reported on Australian Mining

    30 Second Briefing

    A new ARC Research Hub for Critical Energy Separation Materials (CREST Hub), led by Monash University, will develop separation technologies to recover critical minerals from complex ores and waste streams, improve lithium production and cut emissions from materials processing. The national hub links five Australian universities with six industry partners to focus on advanced sorbents, membranes and process-intensification approaches for energy‑efficient separations. Outcomes are expected to target low‑grade and refractory deposits, tailings reprocessing and lower‑carbon flowsheets for battery‑material supply chains.

    Technical Brief

    • CREST will focus on separation materials such as advanced sorbents, ion-exchange media and selective membranes.
    • Research methods will combine lab-scale synthesis and characterisation of separation media with pilot-scale process testing.
    • Data sources are expected to include complex ore feeds, process liquors and waste streams supplied by industry partners.
    • Process-intensification work will examine hybrid unit operations, integrating sorption, membrane and electrochemical steps in single trains.
    • Outputs target flowsheet modifications that retrofit into existing concentrators and refineries without major civil reconfiguration.
    • Practical applications include upgrading low-grade or refractory feeds to reduce downstream comminution and reagent consumption.
    • Scope is limited to separation-materials development and flowsheet integration, not mine design, extraction or pit-to-plant logistics.

    Our Take

    Monash University’s new ARC Research Hub for Critical Energy Separation Materials sits alongside its earlier Critical Minerals Initiative, signalling a deliberate build‑out of end‑to‑end capability from upstream critical minerals supply through to processing and recycling solutions in Australia.

    Related work at Monash on hydrometallurgical recovery of critical metals from spent lithium‑ion batteries suggests this hub is likely to prioritise separation technologies that can operate on both primary lithium ores and secondary waste streams, which is strategically important for closing material loops in Australia’s battery value chain.

    In our Materials coverage, critical minerals and lithium pieces increasingly feature university‑industry hubs rather than single‑company R&D, and the presence of multiple ARC research hubs at Monash points to Australia using publicly backed research clusters as a key lever to de‑risk critical minerals processing domestically.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Niron Magnetics’ $1.8bn Alabama plant: supply chain and design notes for engineers
    Materials
    2 days ago

    Niron Magnetics’ $1.8bn Alabama plant: supply chain and design notes for engineers

    Niron Magnetics will build a $1.8 billion, 1.6-million-square-foot advanced manufacturing campus at the Westgate Super Site in Dothan, Alabama, centred on a 10,000-ton high-volume plant producing rare-earth-free iron nitride permanent magnets. The facility, Niron’s second after a 1,500‑ton‑per‑year plant scheduled for 2027 in Sartell, is expected to add 700 high-wage jobs within five years and use abundant domestic iron and nitrogen feedstocks instead of neodymium. The project, backed by a separate $150 million, 20‑year US defence loan for Minnesota, signals a shift towards geographically diversified, rare-earth-free magnet supply for automotive, defence and AI infrastructure.

    Ecocem’s ACT at Westminster retrofit: low‑carbon concrete lessons for engineers
    Materials
    4 days ago

    Ecocem’s ACT at Westminster retrofit: low‑carbon concrete lessons for engineers

    Ecocem’s ACT low-carbon concrete, which can cut cement-related CO₂ by up to 70% and is compatible with standard batching and placement methods, has been specified by Sisk for the TP Bennett-designed retrofit of the former John Lewis HQ at 171 Victoria Street, Westminster. The scheme will deliver over 200,000 sq ft of Grade A workspace while retaining existing steelwork, concrete and around 500 stainless-steel window frames and glazed units in line with Westminster’s retrofit-first policy. ACT has already been proven on more than 40 European projects, including 9,000m³ at Chessy, France, and is backed by Ecocem’s €220m scale-up programme and a dedicated Dunkirk plant due online in 2027.

    Molten Industries US graphite plant: process, energy and CO₂ lens for engineers
    Materials
    5 days ago

    Molten Industries US graphite plant: process, energy and CO₂ lens for engineers

    Molten Industries has commissioned a 300 t/y demonstration plant in Oakland, California, claimed as the world’s first facility producing battery‑grade graphite from natural gas via methane pyrolysis. The single full‑scale modular reactor converts pipeline natural gas to graphite anode material with reported gas‑to‑graphite yields above 95%, while co‑producing clean hydrogen and eliminating graphitisation furnaces and direct CO₂ process emissions. Molten reports 4× cheaper feedstock and 3× lower electricity use than conventional synthetic graphite, signalling a potential domestic alternative to China‑dominated battery graphite processing.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental