Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Product
    Projects
    Sustainability

    Ecocem’s ACT at Westminster retrofit: low‑carbon concrete lessons for engineers

    November 19, 2026|

    Reviewed by Joe Ashwell

    Ecocem’s ACT at Westminster retrofit: low‑carbon concrete lessons for engineers

    First reported on The Construction Index

    30 Second Briefing

    Ecocem’s ACT low-carbon concrete, which can cut cement-related CO₂ by up to 70% and is compatible with standard batching and placement methods, has been specified by Sisk for the TP Bennett-designed retrofit of the former John Lewis HQ at 171 Victoria Street, Westminster. The scheme will deliver over 200,000 sq ft of Grade A workspace while retaining existing steelwork, concrete and around 500 stainless-steel window frames and glazed units in line with Westminster’s retrofit-first policy. ACT has already been proven on more than 40 European projects, including 9,000m³ at Chessy, France, and is backed by Ecocem’s €220m scale-up programme and a dedicated Dunkirk plant due online in 2027.

    Technical Brief

    • Sisk previously trialled ACT with Ecocem at Wembley Park, providing UK-specific batching and placement experience.
    • ACT has already been used in permanent structural works at Murphy’s Shipley Depot, not just temporary applications.
    • Legendre Construction’s Chessy project is using about 9,000m³ of ACT concrete in major structural elements.
    • Around 500 stainless-steel window frames and glazed units are being reused, limiting façade replacement quantities.
    • Ecocem targets commercial-scale ACT deployment in Europe by 2030, supported by a €220m investment programme.
    • A dedicated ACT production facility at Dunkirk is scheduled to start supplying material from early 2027.

    Our Take

    Ecocem ACT’s use at 171 Victoria Street follows Murphy’s first permanent works pour with the same low‑carbon concrete on a UK infrastructure scheme, signalling that the technology is moving from trials into both building retrofit and live civils environments.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Molten Industries US graphite plant: process, energy and CO₂ lens for engineers
    Materials
    about 19 hours ago

    Molten Industries US graphite plant: process, energy and CO₂ lens for engineers

    Molten Industries has commissioned a 300 t/y demonstration plant in Oakland, California, claimed as the world’s first facility producing battery‑grade graphite from natural gas via methane pyrolysis. The single full‑scale modular reactor converts pipeline natural gas to graphite anode material with reported gas‑to‑graphite yields above 95%, while co‑producing clean hydrogen and eliminating graphitisation furnaces and direct CO₂ process emissions. Molten reports 4× cheaper feedstock and 3× lower electricity use than conventional synthetic graphite, signalling a potential domestic alternative to China‑dominated battery graphite processing.

    VEGA: copper is the new gold in smelter level control – lessons for plant engineers
    Materials
    about 19 hours ago

    VEGA: copper is the new gold in smelter level control – lessons for plant engineers

    Montanwerke Brixlegg’s 550‑year‑old copper‑silver smelter in Tyrol is standardising on VEGA radar level instrumentation to control tightly sequenced copper scrap processing. Non-contact radar sensors are being used on high-temperature furnaces, scrap bunkers and process vessels where dust, steam and variable dielectric properties previously challenged mechanical and ultrasonic devices. For plant engineers, the move signals growing confidence in radar for reliable level control in harsh metallurgical environments, supporting stable throughput and tighter process safety margins.

    GCCA–Energy Web book and claim registry: practical implications for project carbon targets
    Materials
    1 day ago

    GCCA–Energy Web book and claim registry: practical implications for project carbon targets

    The Global Cement and Concrete Association is partnering with Energy Web to build a low‑carbon “book and claim” registry that decouples verified emissions attributes from the physical cement and concrete traded. The system will allow buyers to procure low‑carbon cement or concrete attributes from remote plants, even where local low‑CO₂ production is unavailable, using digital certificates tied to audited emissions data. For designers and contractors, this could enable project‑level embodied carbon targets to be met through attribute purchases while local supply chains decarbonise more slowly.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.

    AllGeotechnicalInfrastructureHazardsEnvironmental