Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product
    Sustainability

    Captura–ElectraLith lithium deal: DLE-R project economics and flowsheet notes

    August 19, 2026|

    Reviewed by Tom Sullivan

    First reported on International Mining – News

    30 Second Briefing

    Captura, a US electrochemical platform provider, and ElectraLith, a direct lithium extraction specialist, have formed a strategic partnership to commercialise ElectraLith’s DLE-R extraction-and-refining technology. The collaboration aims to deploy lower-impact, lower-cost lithium recovery using electrochemical processes rather than traditional evaporation ponds or hard‑rock routes. For project developers, the deal signals growing commercial backing for DLE flowsheets that can be integrated with brine operations to reduce surface footprint and potentially shorten time to first production.

    Technical Brief

    • Partnership centres on ElectraLith’s integrated “DLE‑R” extraction‑and‑refining flowsheet rather than standalone DLE.
    • Captura contributes electrochemical platform expertise, indicating a fully electrochemical brine‑to‑product route.
    • Collaboration is framed around “cleanest, most versatile” lithium recovery, implying broad brine chemistry tolerance.
    • Joint commercialisation suggests a packaged technology offering rather than bespoke, project‑by‑project licensing.
    • Electrochemical focus points to reduced reliance on large evaporation ponds and associated land sterilisation.
    • Process integration of extraction and refining could reduce intermediate handling, reagents and off‑site processing steps.
    • For project developers, such bundled DLE‑plus‑refining platforms may simplify flowsheet risk allocation with technology providers.

    Our Take

    The integration of Captura’s BMED stacks into ElectraLith’s DLE-R platform, highlighted in our related pilot-scale coverage, signals a push towards fully integrated brine-to-chemical flowsheets that could reduce dependence on conventional evaporation ponds in US lithium developments.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 3 hours ago

    Holcim electric mining fleet in Poland: charging design lessons for quarry engineers

    Holcim is expanding its electric mining equipment fleet at the 2 Mt/y Małogoszcz cement plant in Poland, backed by completion of the second stage of a dedicated charging station for its quarry vehicles. The large captive limestone quarry is being used as a testbed to run battery-electric mining units in a continuous production environment, with infrastructure scaled to support multiple heavy-duty machines. For geotechnical and quarry operators, the project offers an early full-scale reference for integrating high-capacity charging into hard rock extraction logistics.

    Wheaton’s billion‑dollar streaming push: portfolio and cost‑curve notes for mine teams
    Mining
    about 3 hours ago

    Wheaton’s billion‑dollar streaming push: portfolio and cost‑curve notes for mine teams

    Wheaton Precious Metals’ new CEO Haytham Hodaly plans to make multi‑billion‑dollar streams, like this year’s US$4.3‑billion silver deal on BHP’s Antamina copper‑zinc mine in Peru, a roughly annual feature as the company deploys about US$4.7 billion in 2026 while keeping over US$2.5 billion in undrawn credit. Wheaton forecasts production rising from 803,000 to 1.2 million gold‑equivalent oz. between 2025 and 2030 from 22 producing assets and more than 20 development projects, with about 80% of its portfolio in the lower half of the cost curve. Newer contracts link ongoing payments to a percentage of spot prices rather than fixed escalators, modestly raising Wheaton’s unit costs but easing long‑term pressure on operators’ cash flow and balance sheets.

    Captura–ElectraLith lithium partnership: process and cost lens for mine planners
    Mining
    about 3 hours ago

    Captura–ElectraLith lithium partnership: process and cost lens for mine planners

    Captura and ElectraLith are integrating Captura’s bipolar membrane electrodialysis (BMED) stacks with ElectraLith’s direct lithium extraction and refining (DLE-R) system in two commercial-scale pilot plants targeting US lithium supply. The DLE-R process is designed to treat multiple brine resources and produce battery-grade lithium hydroxide or carbonate at purities above 99.5%, while BMED aims to cut energy use and capital cost in electrochemical separation. Captura will supply BMED stacks to ElectraLith for at least five years, with pilot commissioning planned for early 2027 to test combined performance at near-commercial scale.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental