Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product
    Sustainability

    AusIMM Mill Operators Conference 2024: optimisation priorities for plant engineers

    August 14, 2026|

    Reviewed by Joe Ashwell

    AusIMM Mill Operators Conference 2024: optimisation priorities for plant engineers

    First reported on Australian Mining

    30 Second Briefing

    AusIMM’s 17th Mill Operators Conference will convene leading metallurgical and processing specialists later this year to focus on boosting plant performance, tightening operational discipline and deploying new technologies across Australian concentrators. Sessions will centre on practical optimisation of grinding and classification circuits, debottlenecking existing mills and integrating advanced process control and digital monitoring into brownfield plants. For plant managers and process engineers, the event signals strong peer focus on throughput gains, energy efficiency and more disciplined operating strategies in mineral processing.

    Technical Brief

    • Program is explicitly targeted at operating mill metallurgists and plant operators, not academic researchers.
    • Sessions are structured around whole-of-plant performance, linking comminution, classification, flotation and dewatering decisions.
    • Vendor participation focuses on mill hardware, wear materials and control systems, enabling side-by-side technology comparison.
    • Peer-reviewed technical papers are archived, providing citable references for plant change justifications.
    • Outcomes typically feed into site metallurgical improvement plans and capital prioritisation cycles across multiple operations.

    Our Take

    AusIMM’s 17th Mill Operators Conference in Australia sits alongside its role co‑hosting the GRX26 Global Resources Innovation Expo in Perth, signalling that AusIMM is positioning itself as a convenor not just for technical plant operators but also for cross‑border innovation networks with Canada, Chile and Peru.

    In our database of 1305 Mining stories, AusIMM appears repeatedly in connection with digital transformation and ESG‑focused awards at GRX26, so a mineral processing‑centred event is likely to carry a strong sustainability and productivity theme rather than being a purely traditional metallurgy forum.

    The repeated pairing of AusIMM and Australian Mining across GRX26 challenge coverage suggests this conference will be leveraged for wider industry visibility, giving technology vendors and operators a platform similar to the GRX26 ‘critical disruptors’ challenge for critical minerals and processing innovation.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners
    Mining
    about 13 hours ago

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams
    Mining
    about 13 hours ago

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams

    South America’s Lithium Triangle holds about 64 million tonnes of identified lithium resources (43% of the global 150 million tonnes), yet geologist José Cabello’s review of 43 salt flats across Argentina, Bolivia and Chile shows that variable brine chemistry, impurities and groundwater behaviour make recovery and costs highly site-specific. Salar de Atacama benefits from ultra‑dry climate, relatively clean brines and strong logistics, while other basins such as Altoandinos, Pedernales, Hombre Muerto Oeste, Rincón, Sal de los Ángeles and Sal de Vida face tighter water and hydrogeological constraints. Direct lithium extraction (DLE) could unlock lower‑grade or impurity‑rich brines, but Cabello stresses that trade‑offs between brine withdrawal and freshwater consumption mean technology selection must be tailored to each basin’s hydrology and ecosystem.

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners
    Mining
    about 13 hours ago

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners

    EU regulators have granted strategic status under the Critical Raw Materials Act to KGHM’s 9.5‑billion‑zloty ($2.44bn) Retków‑Grodziszcze mine and Legnica smelter conversion, unlocking faster permitting, streamlined administration and access to preferential financing. Retków‑Grodziszcze is planned to deliver over 100 million tonnes of ore by 2055, yielding about 1.5 million tonnes of copper and 5,000 tonnes of silver, while Legnica’s recycling line targets 135,000 tonnes of electrolytic copper and 250 tonnes of nickel per year. The move materially boosts EU copper and nickel recycling capacity, central to the CRMA’s 25% recycling target.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental