Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Antipa Minyari resource upgrade: design and pit optimisation notes for planners

    April 7, 2026|

    Reviewed by Tom Sullivan

    Antipa Minyari resource upgrade: design and pit optimisation notes for planners

    First reported on Australian Mining

    30 Second Briefing

    Antipa Minerals has upgraded the mineral resource for its 100 per cent-owned Minyari gold–copper–silver project in Western Australia’s Paterson Province, signalling stronger standalone development potential. The update covers the Minyari and WACA deposits, where previous drilling defined near-surface, high-grade mineralisation amenable to open-pit and potential underground mining, with gold, copper and silver reported over multiple lodes. For geotechnical and mine planners, the revised resource inventory and geometry will directly influence pit shell optimisation, underground access design and potential processing plant scale on a remote greenfields site.

    Technical Brief

    • For comparable greenfields mining projects, such resource upgrades typically trigger revised geotechnical domaining and slope design envelopes.

    Our Take

    Our database shows a steady sequence of Minyari updates through late 2025 and early 2026 (resource upgrade, pre‑feasibility work, then the Fiama lode discovery), signalling that Antipa Minerals is progressively de‑risking the project rather than relying on a single step-change announcement.

    With Minyari positioned as a gold–copper–silver system in Western Australia’s Paterson Province, it sits among a relatively small subset of our gold-tagged coverage that also emphasises copper, which can materially improve project economics under current multi-commodity pricing scenarios.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 13 hours ago

    Minerals Council of Australia backs GRX26: technical takeaways for mine project teams

    Minerals Council of Australia has been confirmed as Endorsing Partner for the Global Resources Innovation Expo (GRX26), positioning the event as a ‘by industry, for industry’ platform for Australia’s mining and METS sector. The MCA, the peak body for major iron ore, coal, gold, copper and critical minerals producers, will use the partnership to promote technology-led productivity, decarbonisation and skills development. For engineers and suppliers, GRX26 now offers a more direct channel to operators and policy influencers shaping mine automation, electrification and processing innovation in Australia.

    Mining
    about 13 hours ago

    Sandvik DD423i development drill rig: drill‑and‑blast control insights for engineers

    Sandvik has launched the DD423i automated twin-boom development drill rig, built on the DD422i platform but engineered for higher drilling accuracy, automation readiness and data integration in underground hard-rock mines. The rig is designed for multi-face development with intelligent drilling controls, compatibility with Sandvik’s AutoMine and OptiMine systems, and upgraded onboard diagnostics to reduce unplanned downtime. For mine engineers, the DD423i targets tighter drill-and-blast control, improved overbreak management and more consistent advance per blast in high-cost development headings.

    Mining
    about 14 hours ago

    St George Mining–Boston Metal MOE trial: flowsheet implications for niobium projects

    St George Mining has signed an MoU with Boston Metal to trial molten oxide electrolysis (MOE) for niobium production at St George’s 100%-owned Araxá niobium-rare earths project in Minas Gerais, Brazil. The joint project will test MOE’s ability to improve niobium recovery and processing efficiency compared with conventional pyrometallurgical and hydrometallurgical routes. For mine developers and metallurgists, the trial will indicate whether MOE can offer a lower-emission, potentially lower-cost flowsheet option for future niobium and REE concentrate processing at Araxá-scale deposits.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy