Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Zijin Longking 230 t battery truck and EACON deal: haulage design notes for engineers

    August 11, 2026|

    Reviewed by Tom Sullivan

    Zijin Longking 230 t battery truck and EACON deal: haulage design notes for engineers

    First reported on International Mining – News

    30 Second Briefing

    Zijin Longking has launched the ZL230E, a 230 t class pure battery-electric mining truck (formerly LK350E) in Longyan, Fujian, claimed as the largest-tonnage pure electric unit currently available. The rollout coincided with an investment promotion event for the “Mining + Intelligent Manufacturing” cluster in Xinluo District, signalling intent to localise large-scale electric haulage manufacturing. Zijin Longking also signed an autonomy partnership with Chinese OEM-agnostic automation specialist EACON, paving the way for future driverless deployment of the ZL230E fleet.

    Technical Brief

    • Rollout and investment promotion event held 10 August 2026 in Longyan City, Fujian Province.
    • ZL230E designation replaces earlier LK350E model name in Zijin Longking’s product line.
    • Event framed within Xinluo District’s “Mining + Intelligent Manufacturing” industrial cluster development programme.

    Our Take

    Zijin Longking’s move from the earlier LK220E units (May 2026 dispatch from Longyan City) to a 230 t-class truck suggests it is quickly scaling up payload classes, positioning Fujian as a base for large-format battery haulage manufacturing rather than just pilot-scale output.

    EACON’s ORCASTRA platform is already running mixed-energy fleets in Xinjiang and cabless AT-150 trucks at SPIC’s South coal mine, so integrating a 230 t pure battery truck gives it a reference portfolio that spans both mid-size and ultra-class autonomous haulage in China.

    With EACON’s recent HKEX listing raising about HK$2.3 billion for autonomous haulage expansion, this partnership with Zijin Longking in Fujian Province is likely to channel some of that capital into scaling software-hardware integration on domestically built ultra-class electric trucks.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 15 hours ago

    Sandvik IEC 62443-4-1 ML3: cybersecurity implications for intelligent mines

    Sandvik has secured IEC 62443-4-1 Maturity Level 3 certification for its secure product development lifecycle, making it one of the first mining OEMs to reach this cybersecurity benchmark. The independently audited ML3 rating confirms that threat modelling, secure coding, vulnerability management and patch processes are systematically built into the design and maintenance of its intelligent mining equipment and digital systems. For mines deploying connected fleets, autonomous loaders and remote drilling rigs, this signals stronger protection against cyber intrusion at both equipment and control-system level.

    BME’s VIPERTRON electronic initiation system: design and timing notes for mine engineers
    Mining
    about 15 hours ago

    BME’s VIPERTRON electronic initiation system: design and timing notes for mine engineers

    BME has launched the VIPERTRON electronic initiation system, a lightweight, compact blasting solution designed for agile deployment in quarries and surface mines using robust radio-frequency communication between field units and the blasting control. The system targets operations still using NONEL by offering tighter timing accuracy and more consistent blast performance, while maintaining simple, portable hardware for crews working in constrained benches and multiple small shots. For engineers, the key shift is towards electronic timing control without the complexity and bulk of traditional wired electronic detonator systems.

    Brightstar’s Laverton expansion corridor: mine planning and haulage lens for engineers
    Mining
    about 15 hours ago

    Brightstar’s Laverton expansion corridor: mine planning and haulage lens for engineers

    Brightstar Resources has secured five exploration licences comprising Panther Metals’ Mikado project around its new Laverton processing plant in Western Australia under a 100 per cent binding tenement sale agreement. The deal consolidates tenure immediately adjacent to the planned processing hub, giving Brightstar direct control over near-plant feed sources rather than relying on satellite ore trucking. For mine planners and geotechs, the enlarged footprint enables integrated pit design, waste dump siting and haulage optimisation across a contiguous land package.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    AllGeotechnicalInfrastructureHazardsEnvironmental