Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Weir on slurry pumping: rubber liners and automation – key notes for mine engineers

    July 31, 2026|

    Reviewed by Tom Sullivan

    Weir on slurry pumping: rubber liners and automation – key notes for mine engineers

    First reported on International Mining – News

    30 Second Briefing

    Weir Global Product Manager – Pumps Asad Mohammed reports that rubber-lined centrifugal slurry pumps are increasingly outperforming metal-lined units, especially in duties with fine-particle slurries where elastomer liners show lower wear and longer service life. He notes that modern rubber compounds now tolerate higher operating pressures and more aggressive chemistries than earlier generations, expanding their use beyond traditional light-duty applications. Mohammed also points to growing demand for automation-ready pumps with integrated condition monitoring, enabling remote performance tracking and predictive maintenance in large mill circuits.

    Technical Brief

    • Mohammed notes slurry rheology and particle size distribution as primary determinants for pump material selection.
    • He emphasises matching impeller and liner materials to both abrasion and corrosion mechanisms, not just one.
    • For coarser, high-impact duties, he still specifies metal-lined pumps to resist particle impact damage.
    • Pump sizing is discussed in terms of operating close to best efficiency point to limit recirculation wear.
    • He points to incorrect pump speed selection as a common cause of accelerated liner and impeller erosion.
    • Mohammed stresses that duty-point changes over mine life require re-evaluation of pump hydraulics, not just motor upsizing.
    • Integration with plant control systems is framed around stable flow and pressure to protect downstream equipment.
    • He links improved pump material choices directly to reduced unplanned mill downtime and lower total ownership cost.

    Our Take

    Recent pieces in our database on Weir’s GEHO pumps for Lloyds Metals’ iron ore slurry pipeline in India show the company already deploying advanced control systems (like GLORES), so any move toward greater automation in slurry pumping is likely to build on field-proven load-management technology rather than starting from scratch.

    The back-to-back orders for Weir crushing circuits at Brightstar Resources’ Laverton gold project in Western Australia suggest that Weir is increasingly bundling comminution and slurry handling solutions, which can give operators a single optimisation envelope for wear, energy use and uptime across the whole wet plant.

    Across the 1,273 mining stories in our coverage, Weir appears frequently in both ‘Projects’ and ‘Product’ tags, signalling that its slurry pumping developments are being adopted in live project scopes rather than remaining at the prototype or trial stage.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners
    Mining
    1 day ago

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams
    Mining
    1 day ago

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams

    South America’s Lithium Triangle holds about 64 million tonnes of identified lithium resources (43% of the global 150 million tonnes), yet geologist José Cabello’s review of 43 salt flats across Argentina, Bolivia and Chile shows that variable brine chemistry, impurities and groundwater behaviour make recovery and costs highly site-specific. Salar de Atacama benefits from ultra‑dry climate, relatively clean brines and strong logistics, while other basins such as Altoandinos, Pedernales, Hombre Muerto Oeste, Rincón, Sal de los Ángeles and Sal de Vida face tighter water and hydrogeological constraints. Direct lithium extraction (DLE) could unlock lower‑grade or impurity‑rich brines, but Cabello stresses that trade‑offs between brine withdrawal and freshwater consumption mean technology selection must be tailored to each basin’s hydrology and ecosystem.

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners
    Mining
    1 day ago

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners

    EU regulators have granted strategic status under the Critical Raw Materials Act to KGHM’s 9.5‑billion‑zloty ($2.44bn) Retków‑Grodziszcze mine and Legnica smelter conversion, unlocking faster permitting, streamlined administration and access to preferential financing. Retków‑Grodziszcze is planned to deliver over 100 million tonnes of ore by 2055, yielding about 1.5 million tonnes of copper and 5,000 tonnes of silver, while Legnica’s recycling line targets 135,000 tonnes of electrolytic copper and 250 tonnes of nickel per year. The move materially boosts EU copper and nickel recycling capacity, central to the CRMA’s 25% recycling target.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental