Victory–Curtin rare earth processing deal: pilot plant implications for mine planners
Reviewed by Tom Sullivan

First reported on MINING.com
30 Second Briefing
Victory Metals has secured access to Curtin University’s A$18.4 million Cathode Precursor Production Pilot Plant (C4P) in Perth to process heavy rare earth concentrate from its Burswood plant into mixed rare earth carbonate (MREC) at pilot scale through 2027. MREC samples will be returned to Victory for technical assessment and benchmarking with international offtake and refining partners, and to validate an Australian processing route for concentrate from the North Stanmore rare earth project. The deal strengthens a domestic heavy rare earth supply chain as Australia and the US move to curb Chinese control over processing capacity.
Technical Brief
- Curtin’s Cathode Precursor Production Pilot Plant (C4P) embodies more than A$18.4 million in processing infrastructure.
- Material transfer agreement explicitly routes Burswood-produced heavy rare earth concentrate into C4P for downstream piloting.
- Pilot facility was originally configured to support battery and critical minerals cathode precursor production in Western Australia.
- Victory will receive physical MREC product from C4P for internal technical assessment and specification benchmarking.
- International offtake and refining partners will co‑evaluate MREC samples, informing future refining route selection and contracts.
- Agreement term extends to 2027, providing a multi‑year window for flowsheet optimisation and scale‑up planning.
- Pilot work is tied directly to validating a processing pathway for concentrate sourced from North Stanmore rare earth project.
- Contextually, China currently accounts for ~60% of mined rare earth output and nearly all processing capacity.
Our Take
The collaboration around Curtin University’s Burswood C4P facility gives Victory Metals a domestic processing pathway that aligns with its push into the US defence supply chain flagged in the 2026 DIBX Philadelphia coverage, reducing reliance on China, which still accounts for about 60% of mined rare earth output.
Earlier pilot work at Perth for North Stanmore showed a near-60-fold upgrade in rare earth concentration, and tying that into an A$18.4 million-scale C4P plant suggests Victory is moving from bench-scale success towards flowsheets that could be credibly referenced in its pre-feasibility economics (post-tax NPV A$1.21 billion).
Within our mining database, rare earth and heavy rare earth pieces are a relatively small subset of the 1,246 mining stories, so the cluster of recent items on Victory Metals and North Stanmore signals the project is emerging as one of the more advanced Australian heavy rare earth plays under active technical de-risking.
Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.
Related Articles
Related Industries & Products
Mining
Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.
Construction
Quality control software for construction companies with material testing, batch tracking, and compliance management.
CMRR-io
Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.
HYDROGEO-io
Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.
GEODB-io
Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.


