Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Brightstar’s 305m gold hit at Two Mile Hill: bulk underground potential for engineers

    November 12, 2026|

    Reviewed by Joe Ashwell

    Brightstar’s 305m gold hit at Two Mile Hill: bulk underground potential for engineers

    First reported on Australian Mining

    30 Second Briefing

    Brightstar Resources has reported its largest Sandstone result at the Two Mile Hill deposit in WA, intersecting 305m at 2.66g/t gold from 503m depth in diamond hole TMHDD26005. The interval contains multiple high-grade zones, including 4.1m at 26.1g/t, 5.5m at 25.2g/t and 4m at higher-grade material within the broader mineralised envelope. The scale and continuity of this intercept materially upgrade the grade-times-width profile of Two Mile Hill, supporting potential for bulk underground mining scenarios and further deep drilling.

    Technical Brief

    • Result is described by Brightstar as its largest Sandstone intercept on a grade–width basis to date.

    Our Take

    The 305m intersection at the Two Mile Hill deposit sits alongside Brightstar Resources’ earlier 167m at 2.07g/t at Bull Oak, suggesting the broader Sandstone corridor is shaping up as a bulk-tonnage underground and open-pit pipeline rather than a single high-grade shoot play.

    With Brightstar targeting first gold from its Laverton Goldfields development in June 2027 and reporting 50 per cent EPC earned value on the Laverton processing plant, deeper mineralisation at Sandstone in Western Australia could be timed to backfill or extend plant utilisation once initial feed sources are depleted.

    In our database of Mining–Projects coverage, there are relatively few Western Australia gold stories combining >300m intersections from >500m depth with multiple >25g/t internal zones, which will likely push Brightstar to prioritise further deep drilling and potential underground scoping at Two Mile Hill ahead of some of its 11 shallower Sandstone targets.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    BHP record WA community spend: procurement signals for mining contractors
    Mining
    about 2 hours ago

    BHP record WA community spend: procurement signals for mining contractors

    BHP has reported a record $1.1 billion in community expenditure across Western Australia for FY2026, including $627 million in procurement from Indigenous and Traditional Owner businesses. The miner’s 2026 Western Australia Community Development Report also details more than $850 million in payments to local suppliers, councils and community partners, signalling a heavy regional spend alongside its iron ore and nickel operations. For contractors and service providers, the scale of Indigenous and local sourcing points to strong demand for WA-based capability and joint ventures.

    AIC Mines’ 18.7Mt Mt Cuthbert copper project: planning signals for mine engineers
    Mining
    about 2 hours ago

    AIC Mines’ 18.7Mt Mt Cuthbert copper project: planning signals for mine engineers

    AIC Mines has closed a $70 million acquisition of Materra Metals, securing 100 per cent ownership of the Mt Cuthbert copper project in north‑west Queensland and adding 18.7 million tonnes of copper resources to its portfolio. The company plans a major drilling program in 2027, signalling a shift from resource consolidation to definition drilling and potential mine planning at Mt Cuthbert. For geotechnical and mine planners, the deal points to upcoming demand for pit design, hydrogeology, and infrastructure studies in a historically underdeveloped copper district.

    Aureka’s Fiddlers Creek acquisition: near-term gold production lens for planners
    Mining
    about 2 hours ago

    Aureka’s Fiddlers Creek acquisition: near-term gold production lens for planners

    Aureka has signed a binding share sale agreement to acquire 100 per cent of High Grade Holdings, parent of Core Prospecting, pivoting the ASX-listed junior from pure exploration to near-term gold production in Victoria. The deal adds the Fiddlers Creek operation to Aureka’s existing Stawell Corridor, St Arnaud and Jubilee projects, consolidating a regional portfolio along proven high-grade gold structures. For mine planners and geotechs, the move signals a shift towards reactivating historic workings and integrating small-scale production with ongoing resource definition drilling.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental