Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    US critical minerals funding resilience: key takeaways for mine project teams

    November 11, 2026|

    Reviewed by Tom Sullivan

    US critical minerals funding resilience: key takeaways for mine project teams

    First reported on MINING.com

    30 Second Briefing

    US critical minerals funding is expected to remain robust into 2027 despite any shift in Congress, with Clark Street Associates noting more than $5.4 billion already secured for clients and substantial unspent reconciliation and industrial funding still available to the administration. The US Defense Logistics Agency’s recent $2 billion commitment for National Defense Stockpile purchases and a combined $14.7 million in Defence Production Act awards to Canada’s Fortune Minerals and Lomiko Metals show ongoing support for mining, processing and refining capacity. Advisers expect tighter congressional scrutiny on project selection and transparency rather than a near-term cut in deal flow, so developers must prepare for more rigorous justification of processing routes, locations and partners.

    Technical Brief

    • Clark Street Associates has already arranged $5.4 billion in combined federal and state support across clients.
    • Unspent reconciliation-legislation allocations give the administration multi‑year authority to sign new minerals-related awards.
    • National Defense Authorization Act remains the main vehicle for inserting critical-minerals policy and funding direction.
    • Advisory focus is shifting to transaction structuring, siting of refining, and bipartisan political cover for each award.

    Our Take

    The US Defense Logistics Agency’s $2 billion stockpile acquisition commitment for critical minerals contrasts with the sharp de-rating of global mining equities in our 2 November 2026 piece, suggesting Washington is prepared to lean into strategic buying even as private capital pulls back from the sector.

    With Canada-based juniors like Fortune Minerals and Lomiko Metals mentioned alongside US Department of Defense mechanisms, this signals that North American critical minerals policy is likely to keep cross‑border supply chains in play rather than pivoting to a purely domestic US sourcing model heading into 2027.

    Gold appears here mainly as a strategic metal rather than a price play, which is notable given our coverage of extreme gold price volatility in 2026; that separation implies defence‑driven procurement for gold and other critical minerals may remain relatively insulated from short‑term market swings when contracts are structured.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    American Barrick IPO: asset mix, cash flows and timing insights for mine planners
    Mining
    about 1 hour ago

    American Barrick IPO: asset mix, cash flows and timing insights for mine planners

    Barrick Mining has filed a Form S-11 with the US Securities and Exchange Commission to spin out its North American gold assets into American Barrick Gold Corporation, targeting a New York Stock Exchange listing under the ticker ‘ABGC’. The new vehicle will hold Barrick’s US joint-venture interests within Nevada Gold Mines and the high-grade Fourmile discovery in Nevada, plus its stake in Pueblo Viejo, with net IPO proceeds to be upstreamed to Barrick and returned to shareholders. CEO Mark Hill, appointed in August to lead the unit, has cautioned the IPO may slip into January due to regulatory formalities.

    Critical minerals price volatility: project risk takeaways for mine planners
    Mining
    about 1 hour ago

    Critical minerals price volatility: project risk takeaways for mine planners

    Price volatility in lithium, copper, nickel and other critical minerals is causing 23% of otherwise viable projects to be deferred or cancelled and is a dealbreaker for a further 12% of developers, investors and miners in DLA Piper’s 550-respondent survey. More than half see volatility as a major constraint, with 28% unable to secure bankable long-term offtake, 27% postponing investment decisions and 26% facing higher cost of capital, particularly in the UK and US. In response, 37% of developers and 32% of producers are pursuing vertical integration from mine to recycling, while many favour component-linked pricing or long-term fixed contracts with periodic resets over spot benchmarks.

    Gunnison’s rich copper-zinc hit in Arizona: processing options for mine planners
    Mining
    about 1 hour ago

    Gunnison’s rich copper-zinc hit in Arizona: processing options for mine planners

    Gunnison Copper has confirmed a high-grade copper-zinc zone at the Strong & Harris deposit in Arizona, with drill hole SHM-2 cutting 94.8 metres at 1.39% Cu and 2.29% Zn from 160 metres depth, including 12.2 metres at 5.15% Cu, 11.99% Zn and 16.38 g/t Ag. The company will run flotation tests on sulphide material to determine recoveries and economics for potential copper and zinc concentrates, as an alternative to the current heap leach–SX–EW flowsheet in its March PEA. Gunnison is already producing copper at nearby Johnson Camp using Rio Tinto’s Nuton leaching technology under an $8 million demonstration agreement running to 2029.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental