Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Critical minerals price volatility: project risk takeaways for mine planners

    November 11, 2026|

    Reviewed by Tom Sullivan

    Critical minerals price volatility: project risk takeaways for mine planners

    First reported on MINING.com

    30 Second Briefing

    Price volatility in lithium, copper, nickel and other critical minerals is causing 23% of otherwise viable projects to be deferred or cancelled and is a dealbreaker for a further 12% of developers, investors and miners in DLA Piper’s 550-respondent survey. More than half see volatility as a major constraint, with 28% unable to secure bankable long-term offtake, 27% postponing investment decisions and 26% facing higher cost of capital, particularly in the UK and US. In response, 37% of developers and 32% of producers are pursuing vertical integration from mine to recycling, while many favour component-linked pricing or long-term fixed contracts with periodic resets over spot benchmarks.

    Technical Brief

    • Respondents explicitly link volatility to tariffs, wars and other named geopolitical tensions affecting commodity pricing.
    • UK and US projects show the highest sensitivity, with 16% and 18% respectively calling volatility a dealbreaker.
    • German-based participants are outliers: none see volatility as a dealbreaker and only 8% call it a major problem.
    • Australian respondents treat volatility as one of several “material considerations” rather than the primary investment barrier.
    • 37% of surveyed developers and 32% of mining/raw material producers have already adopted vertical integration strategies.
    • Vertical integration spans mine, refinery, manufacturing and recycling stages to insulate operations from upstream supply squeezes.
    • 37% of all participants favour component-linked pricing over raw material spot benchmarks for contract structuring.
    • Long-term fixed pricing with periodic resets is preferred by 48% of mining and raw materials producers.
    • DLA Piper partners argue capital will concentrate in regions perceived to offer execution credibility and supply-chain proximity.

    Our Take

    Rare Earth Americas, cited in the DLA Piper critical minerals survey, also features in our coverage for its Alpha ionic clay rare earth project in Brazil, signalling that developers active in higher-risk processing domains are simultaneously grappling with the offtake and pricing uncertainty highlighted in the report.

    The relatively higher share of UK and US respondents flagging price volatility as a dealbreaker, compared with Germany, is consistent with other recent critical minerals items in our coverage where Anglo-American projects report more acute financing and permitting friction, suggesting continental European industrial policy may be cushioning some volatility risk for developers.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    US critical minerals funding resilience: key takeaways for mine project teams
    Mining
    about 1 hour ago

    US critical minerals funding resilience: key takeaways for mine project teams

    US critical minerals funding is expected to remain robust into 2027 despite any shift in Congress, with Clark Street Associates noting more than $5.4 billion already secured for clients and substantial unspent reconciliation and industrial funding still available to the administration. The US Defense Logistics Agency’s recent $2 billion commitment for National Defense Stockpile purchases and a combined $14.7 million in Defence Production Act awards to Canada’s Fortune Minerals and Lomiko Metals show ongoing support for mining, processing and refining capacity. Advisers expect tighter congressional scrutiny on project selection and transparency rather than a near-term cut in deal flow, so developers must prepare for more rigorous justification of processing routes, locations and partners.

    American Barrick IPO: asset mix, cash flows and timing insights for mine planners
    Mining
    about 1 hour ago

    American Barrick IPO: asset mix, cash flows and timing insights for mine planners

    Barrick Mining has filed a Form S-11 with the US Securities and Exchange Commission to spin out its North American gold assets into American Barrick Gold Corporation, targeting a New York Stock Exchange listing under the ticker ‘ABGC’. The new vehicle will hold Barrick’s US joint-venture interests within Nevada Gold Mines and the high-grade Fourmile discovery in Nevada, plus its stake in Pueblo Viejo, with net IPO proceeds to be upstreamed to Barrick and returned to shareholders. CEO Mark Hill, appointed in August to lead the unit, has cautioned the IPO may slip into January due to regulatory formalities.

    Gunnison’s rich copper-zinc hit in Arizona: processing options for mine planners
    Mining
    about 1 hour ago

    Gunnison’s rich copper-zinc hit in Arizona: processing options for mine planners

    Gunnison Copper has confirmed a high-grade copper-zinc zone at the Strong & Harris deposit in Arizona, with drill hole SHM-2 cutting 94.8 metres at 1.39% Cu and 2.29% Zn from 160 metres depth, including 12.2 metres at 5.15% Cu, 11.99% Zn and 16.38 g/t Ag. The company will run flotation tests on sulphide material to determine recoveries and economics for potential copper and zinc concentrates, as an alternative to the current heap leach–SX–EW flowsheet in its March PEA. Gunnison is already producing copper at nearby Johnson Camp using Rio Tinto’s Nuton leaching technology under an $8 million demonstration agreement running to 2029.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    AllGeotechnicalInfrastructureHazardsEnvironmental