Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Gunnison’s rich copper-zinc hit in Arizona: processing options for mine planners

    November 11, 2026|

    Reviewed by Joe Ashwell

    Gunnison’s rich copper-zinc hit in Arizona: processing options for mine planners

    First reported on MINING.com

    30 Second Briefing

    Gunnison Copper has confirmed a high-grade copper-zinc zone at the Strong & Harris deposit in Arizona, with drill hole SHM-2 cutting 94.8 metres at 1.39% Cu and 2.29% Zn from 160 metres depth, including 12.2 metres at 5.15% Cu, 11.99% Zn and 16.38 g/t Ag. The company will run flotation tests on sulphide material to determine recoveries and economics for potential copper and zinc concentrates, as an alternative to the current heap leach–SX–EW flowsheet in its March PEA. Gunnison is already producing copper at nearby Johnson Camp using Rio Tinto’s Nuton leaching technology under an $8 million demonstration agreement running to 2029.

    Technical Brief

    • Gunnison estimates true thicknesses of 82.1 m for the main SHM-2 interval and 10.5 m for the higher-grade core.
    • Strong & Harris hosts 69 Mt inferred at 0.49% Cu, 0.56% Zn and ~4.1 g/t Ag (January 2023).
    • Contained metal in that inferred resource totals ~335,700 t Cu, 388,100 t Zn and 9 Moz Ag.
    • Flotation testwork is specifically targeting sulphide material to generate saleable Cu and Zn concentrates with Ag credits.
    • Any concentrator addition would modify the March PEA’s open-pit, heap leach–SX–EW copper-only flowsheet.
    • Gunnison’s Johnson Camp operation is concurrently trialling Rio Tinto’s Nuton leaching technology under a 2027–2029 demonstration.
    • Nuton agreed in September to pay Gunnison US$8 million (C$11.3 million) after expanding mined demonstration tonnage.

    Our Take

    Nuton’s earlier bioleach work at Johnson Camp, which delivered first 99.99% copper cathode by late 2025, means any additional sulphide or mixed mineralisation at Strong & Harris could be candidates for the same processing route, potentially lowering capex compared with a greenfield concentrator in Arizona.

    With Amazon Web Services already lined up as an offtaker for Nuton‑produced copper from Johnson Camp, incremental copper units from the Gunnison project give Gunnison Copper and Rio Tinto more flexibility to structure premium, low‑carbon or technology‑linked copper cathode supply contracts out of Arizona.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    US critical minerals funding resilience: key takeaways for mine project teams
    Mining
    about 1 hour ago

    US critical minerals funding resilience: key takeaways for mine project teams

    US critical minerals funding is expected to remain robust into 2027 despite any shift in Congress, with Clark Street Associates noting more than $5.4 billion already secured for clients and substantial unspent reconciliation and industrial funding still available to the administration. The US Defense Logistics Agency’s recent $2 billion commitment for National Defense Stockpile purchases and a combined $14.7 million in Defence Production Act awards to Canada’s Fortune Minerals and Lomiko Metals show ongoing support for mining, processing and refining capacity. Advisers expect tighter congressional scrutiny on project selection and transparency rather than a near-term cut in deal flow, so developers must prepare for more rigorous justification of processing routes, locations and partners.

    American Barrick IPO: asset mix, cash flows and timing insights for mine planners
    Mining
    about 1 hour ago

    American Barrick IPO: asset mix, cash flows and timing insights for mine planners

    Barrick Mining has filed a Form S-11 with the US Securities and Exchange Commission to spin out its North American gold assets into American Barrick Gold Corporation, targeting a New York Stock Exchange listing under the ticker ‘ABGC’. The new vehicle will hold Barrick’s US joint-venture interests within Nevada Gold Mines and the high-grade Fourmile discovery in Nevada, plus its stake in Pueblo Viejo, with net IPO proceeds to be upstreamed to Barrick and returned to shareholders. CEO Mark Hill, appointed in August to lead the unit, has cautioned the IPO may slip into January due to regulatory formalities.

    Critical minerals price volatility: project risk takeaways for mine planners
    Mining
    about 1 hour ago

    Critical minerals price volatility: project risk takeaways for mine planners

    Price volatility in lithium, copper, nickel and other critical minerals is causing 23% of otherwise viable projects to be deferred or cancelled and is a dealbreaker for a further 12% of developers, investors and miners in DLA Piper’s 550-respondent survey. More than half see volatility as a major constraint, with 28% unable to secure bankable long-term offtake, 27% postponing investment decisions and 26% facing higher cost of capital, particularly in the UK and US. In response, 37% of developers and 32% of producers are pursuing vertical integration from mine to recycling, while many favour component-linked pricing or long-term fixed contracts with periodic resets over spot benchmarks.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental