Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Tonly hybrid 91 t truck fleet in Brazil: haulage performance insights for mine engineers

    August 6, 2026|

    Reviewed by Tom Sullivan

    Tonly hybrid 91 t truck fleet in Brazil: haulage performance insights for mine engineers

    First reported on International Mining – News

    30 Second Briefing

    Tonly Heavy Industries is deploying a fleet of hybrid 91 t class wide-body mining trucks to a contractor’s R&D operations in Brazil, extending its off-highway portfolio that already exceeds 70,000 units in service worldwide. The company reports more than 8,000 units delivered to overseas markets and claims that roughly half of all new-energy mining transport units globally are its vehicles. For mine operators, the Brazilian deployment will provide real-world data on fuel–electric performance, haul profiles and maintenance behaviour in a high-production environment.

    Technical Brief

    • Hybrid trucks are 91 t class wide-body dumpers, targeting high-volume, short-haul mine profiles.
    • Fleet is being deployed to a contractor’s dedicated R&D operation rather than a production client site.
    • Brazilian testwork will focus on fuel–electric interaction under local ramp gradients and ambient temperatures.
    • Data collection will include duty cycles, regenerative braking utilisation and battery–engine load sharing behaviour.
    • Maintenance records from the R&D fleet are expected to benchmark component life versus conventional mechanical trucks.
    • Results will inform haul road design optimisation, including curvature, gradients and surface condition for hybrids.
    • Contractor R&D setting allows controlled A/B comparison of hybrid versus diesel fleets on identical haul routes.
    • Outcomes are likely to influence future truck selection criteria for mining projects in similar climates.

    Our Take

    Tonly Heavy Industries’ deployment of a 91 t hybrid fleet in Brazil extends the company’s recent push from China into export markets, following its framework agreement to supply 800 autonomous trucks to Xinjiang Hanxiang, and signals that its ‘new-energy’ haulage platform is now being proven in multiple regulatory and operating environments.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners
    Mining
    about 22 hours ago

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams
    Mining
    about 22 hours ago

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams

    South America’s Lithium Triangle holds about 64 million tonnes of identified lithium resources (43% of the global 150 million tonnes), yet geologist José Cabello’s review of 43 salt flats across Argentina, Bolivia and Chile shows that variable brine chemistry, impurities and groundwater behaviour make recovery and costs highly site-specific. Salar de Atacama benefits from ultra‑dry climate, relatively clean brines and strong logistics, while other basins such as Altoandinos, Pedernales, Hombre Muerto Oeste, Rincón, Sal de los Ángeles and Sal de Vida face tighter water and hydrogeological constraints. Direct lithium extraction (DLE) could unlock lower‑grade or impurity‑rich brines, but Cabello stresses that trade‑offs between brine withdrawal and freshwater consumption mean technology selection must be tailored to each basin’s hydrology and ecosystem.

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners
    Mining
    about 22 hours ago

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners

    EU regulators have granted strategic status under the Critical Raw Materials Act to KGHM’s 9.5‑billion‑zloty ($2.44bn) Retków‑Grodziszcze mine and Legnica smelter conversion, unlocking faster permitting, streamlined administration and access to preferential financing. Retków‑Grodziszcze is planned to deliver over 100 million tonnes of ore by 2055, yielding about 1.5 million tonnes of copper and 5,000 tonnes of silver, while Legnica’s recycling line targets 135,000 tonnes of electrolytic copper and 250 tonnes of nickel per year. The move materially boosts EU copper and nickel recycling capacity, central to the CRMA’s 25% recycling target.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental