Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award
    Sustainability

    Supra Elemental Recovery DoD scandium contract: process and supply insights for engineers

    October 1, 2026|

    Reviewed by Joe Ashwell

    Supra Elemental Recovery DoD scandium contract: process and supply insights for engineers

    First reported on MINING.com

    30 Second Briefing

    Texas startup Supra Elemental Recovery has secured a Phase I SBIR contract from the US Department of Defense’s Defense Logistics Agency to advance scandium recovery from North American industrial byproducts using its proprietary chemical separation platform. Spun out of the University of Texas at Austin, Supra applies peer-reviewed separation technologies directly at mining and industrial sites to selectively recover rare earth elements and other critical minerals from existing feedstocks. The project will test feasibility and scalability for high‑purity scandium production, targeting onshore resources to reduce total US reliance on imported scandium.

    Technical Brief

    • No award value disclosed, implying early‑stage R&D emphasis rather than immediate commercial plant capex.
    • The work targets scandium contained in North American industrial residues, not primary ore bodies.

    Our Take

    Supra Elemental Recovery’s Phase I SBIR award from the U.S. Department of Defense builds on the oversubscribed $2 million pre-seed round noted in our database, signalling that both defence and private capital are aligning around its UT Austin–derived refining platform for scandium and other critical minerals.

    The explicit link to polymetallic nodule material in a U.S. context is unusual in our mining coverage and suggests the Defense Logistics Agency is at least testing pathways for future seabed-derived critical mineral inputs, even as NOAA’s regulatory stance keeps commercial-scale nodule exploitation uncertain.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Yancoal’s Kestrel acquisition: longwall geotechnical notes for mine planners
    Mining
    about 3 hours ago

    Yancoal’s Kestrel acquisition: longwall geotechnical notes for mine planners

    Yancoal Australia has acquired an 80 per cent interest in the Kestrel underground metallurgical coal mine in Queensland’s Bowen Basin by purchasing 100 per cent of Kestrel Coal Group for an upfront US$1.85 billion cash consideration, subject to completion adjustments. The deal gives Yancoal control over a longwall operation producing premium hard coking coal linked to existing rail and port infrastructure at Gladstone. For geotechnical and mining teams, the acquisition signals continued investment in deep, high-capex underground coal with sustained demand for longwall support, strata control and ventilation expertise.

    Lynas–Meteoric deal and Caldeira project: strategic notes for mine planners
    Mining
    about 3 hours ago

    Lynas–Meteoric deal and Caldeira project: strategic notes for mine planners

    Lynas Rare Earths will acquire Meteoric Resources in an all-scrip deal valuing Meteoric at about A$1.45 billion, securing the Caldeira ionic clay rare earths project in Minas Gerais, Brazil. Caldeira is described as the largest known ionic clay rare earth oxide resource outside China, with a definitive feasibility study due in the March 2026 quarter and first production targeted for 2028. The move gives Lynas a major non-Chinese, non-hard-rock feed source for its existing cracking and separation plants in Australia and Malaysia.

    Bubble–particle interaction in MAXGen cells: design notes for concentrator engineers
    Mining
    about 3 hours ago

    Bubble–particle interaction in MAXGen cells: design notes for concentrator engineers

    TAKRAF Group is upgrading flotation performance with its DELKOR BQR MAXGen cells, using optimised hydrodynamics and improved bubble–particle interaction to boost recovery from increasingly complex ore bodies while cutting energy use. The MAXGen design focuses on controlled air dispersion, high shear zones and stable froth conditions to improve fine particle attachment and reduce reagent consumption. For brownfield concentrators, retrofitting these cells into existing circuits offers a relatively low-footprint route to higher metallurgical performance without major layout changes.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental