Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Research
    Sustainability

    SuperCritical–University of Michigan offshore uranium recovery: hydrodynamic design not...

    September 24, 2026|

    Reviewed by Tom Sullivan

    SuperCritical–University of Michigan offshore uranium recovery: hydrodynamic design not...

    First reported on MINING.com

    30 Second Briefing

    SuperCritical Materials Corp. has partnered with the University of Michigan to mechanically validate its uranium‑from‑seawater adsorbent for industrial‑scale offshore deployment, using hydrodynamic testing in the Aaron Friedman Marine Hydrodynamics Laboratory’s wave and current tanks. The programme will characterise the adsorbent under packing, deployment, ocean exposure and retrieval stresses, optimise packing configurations, and build and test prototypes for repeated deployment–recovery cycles. Findings will feed into a future feasibility study and nearshore pilot designs, targeting integration of seawater‑derived uranium into the US nuclear‑fuel supply chain.

    Technical Brief

    • SuperCritical’s licensed adsorbent captures dissolved uranium directly from flowing seawater across its surface.
    • Research at the Aaron Friedman Marine Hydrodynamics Laboratory will use controlled wave and current tank testing.
    • Experimental programme will mechanically characterise adsorbent behaviour under packing, deployment, ocean exposure and retrieval stresses.
    • Prototyping will focus on systems able to handle large adsorbent quantities through repeated operating cycles.
    • Data from these tests will feed into industrial-scale offshore system design and nearshore development concepts.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Freeport’s $77M Aurora West copper stake: project and drilling lens for mine planners
    Mining
    about 22 hours ago

    Freeport’s $77M Aurora West copper stake: project and drilling lens for mine planners

    Freeport-McMoRan has agreed to pay $77.2 million for 51% of TDG Gold’s Aurora West project in British Columbia, with options to lift its stake to 75% in the Aurora West JV and 100% in a separate ClaimsCo by funding $80 million in exploration and paying a further $40 million. The deal consolidates ground around the Aurora copper-gold discovery in the Toodoggone district, where Freeport already funds a 630 sq. km programme with Amarc Resources and has drilled almost 14,000 m in 16 holes. TDG retains 25% of the JV plus a 2% NSR on specified claims and will use proceeds to advance its Shasta gold-silver project without new equity.

    Capstone Copper cuts outlook as Pinto Valley restart slips: reliability lens for engineers
    Mining
    about 22 hours ago

    Capstone Copper cuts outlook as Pinto Valley restart slips: reliability lens for engineers

    Capstone Copper has cut its 2026 copper production floor by 5,000 tonnes to 195,000 tonnes after delaying full restart of the Pinto Valley mine in Arizona to mid-December due to additional primary crusher repairs, with OEM-fabricated mechanical components still off-site. Interim mobile crushers are expected to process up to 40,000 tonnes per day, about two-thirds of Pinto Valley’s 60,000‑tonne‑per‑day concentrator capacity, following Q3 output of 6,358 tonnes versus 9,949 tonnes a year earlier. A national truckers’ strike in Chile is adding logistics risk for fuel and sulphuric acid supply to Mantoverde and Mantos Blancos, compounding concerns over operational reliability into 2027.

    Modern Mining NYSE American debut: e-waste feedstock and process notes for engineers
    Mining
    about 22 hours ago

    Modern Mining NYSE American debut: e-waste feedstock and process notes for engineers

    Modern Mining began trading on the NYSE American under ticker “MDRN” after a roughly US$40 million IPO, closing its first day down 3.5% with a market capitalisation of about US$36.1 million. The company uses a proprietary aqueous-based process to recover gold, silver, copper, palladium and other metals from electronic waste, targeting above-ground feedstock from discarded electronics. CEO Jeet Basi said the listing and new capital will be used to scale processing capacity as the US seeks to retain more critical mineral-bearing material domestically.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental