Geomechanics.io

  • Free Tools
Sign UpLog In
Projects
Product

Modern Mining NYSE American debut: e-waste feedstock and process notes for engineers

November 14, 2026|

Reviewed by Joe Ashwell

Modern Mining NYSE American debut: e-waste feedstock and process notes for engineers

First reported on MINING.com

30 Second Briefing

Modern Mining began trading on the NYSE American under ticker “MDRN” after a roughly US$40 million IPO, closing its first day down 3.5% with a market capitalisation of about US$36.1 million. The company uses a proprietary aqueous-based process to recover gold, silver, copper, palladium and other metals from electronic waste, targeting above-ground feedstock from discarded electronics. CEO Jeet Basi said the listing and new capital will be used to scale processing capacity as the US seeks to retain more critical mineral-bearing material domestically.

Technical Brief

  • Modern Mining applies a proprietary aqueous-based leaching system to extract Au, Ag, Cu and Pd from e‑waste.
  • Feedstock consists of discarded electronics, effectively treating above-ground “urban ore” rather than in situ deposits.
  • CEO Jeet Basi emphasises reduced lead time versus conventional mines, which typically require years to reach production.
  • Capital raised is earmarked for scaling plant capacity and increasing throughput of electronic scrap material.
  • Domestic processing of critical metal-bearing waste aligns with US policy to shorten and localise supply chains.

Our Take

Modern Mining’s NYSE American listing follows a run of critical-minerals IPOs on the same board, including IMC Rare Earths and the planned Rare Earths Americas float, signalling that NYSE American is becoming the preferred venue for smaller US-focused critical mineral and e-waste plays rather than the main NYSE board.

Our database shows only a handful of US e-waste recovery stories compared with conventional gold or copper projects, so Modern Mining’s focus on recovering gold, silver, copper and palladium from critical mineral-bearing material positions it in a relatively uncrowded niche among the 1279 Mining stories tracked.

The roughly US$40 million IPO proceeds and resulting US$36.1 million market capitalisation suggest Modern Mining is capitalised at a scale similar to other early-stage critical minerals issuers on NYSE American, which typically need to demonstrate rapid commercialisation milestones—such as the Greenville e-waste plant ramp-up—to support follow-on capital raises.

Geotechnical Software for Modern Teams

Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

Cancel at any time.

  • Save and export unlimited calculations
  • Advanced data visualisation
  • Generate professional PDF reports
  • Cloud storage for all your projects

Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

Related Articles

Freeport’s $77M Aurora West copper stake: project and drilling lens for mine planners
Mining
about 1 hour ago

Freeport’s $77M Aurora West copper stake: project and drilling lens for mine planners

Freeport-McMoRan has agreed to pay $77.2 million for 51% of TDG Gold’s Aurora West project in British Columbia, with options to lift its stake to 75% in the Aurora West JV and 100% in a separate ClaimsCo by funding $80 million in exploration and paying a further $40 million. The deal consolidates ground around the Aurora copper-gold discovery in the Toodoggone district, where Freeport already funds a 630 sq. km programme with Amarc Resources and has drilled almost 14,000 m in 16 holes. TDG retains 25% of the JV plus a 2% NSR on specified claims and will use proceeds to advance its Shasta gold-silver project without new equity.

Capstone Copper cuts outlook as Pinto Valley restart slips: reliability lens for engineers
Mining
about 1 hour ago

Capstone Copper cuts outlook as Pinto Valley restart slips: reliability lens for engineers

Capstone Copper has cut its 2026 copper production floor by 5,000 tonnes to 195,000 tonnes after delaying full restart of the Pinto Valley mine in Arizona to mid-December due to additional primary crusher repairs, with OEM-fabricated mechanical components still off-site. Interim mobile crushers are expected to process up to 40,000 tonnes per day, about two-thirds of Pinto Valley’s 60,000‑tonne‑per‑day concentrator capacity, following Q3 output of 6,358 tonnes versus 9,949 tonnes a year earlier. A national truckers’ strike in Chile is adding logistics risk for fuel and sulphuric acid supply to Mantoverde and Mantos Blancos, compounding concerns over operational reliability into 2027.

Mineros’ gold bet: liquidity, collateral and margin-call risks for mine planners
Mining
about 1 hour ago

Mineros’ gold bet: liquidity, collateral and margin-call risks for mine planners

Mineros bought US$137.3 million of bullion in Q3, pushed reported operating cash flow to negative US$21.6 million, and expanded gold-backed borrowings to US$127.7 million, with Red Cloud analyst Alina Islam warning that margin-call risk is rising as about 88% of its physical gold is now pledged. The company’s Swiss unit posted 28,981 oz. of gold in October for roughly US$105 million of repo financing, while also holding a forward contract to buy 18,650 oz. at US$4,740/oz. Despite this leveraged treasury position, Mineros generated US$140 million adjusted EBITDA, lifted quarterly output to 62,253 oz., and is proposing a C$0.20/share special dividend totalling about C$58 million.

Related Industries & Products

Mining

Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

CMRR-io

Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

HYDROGEO-io

Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

GEODB-io

Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalInfrastructureHazardsEnvironmental