Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Rox’s Youanmi gold adopts Glencore Albion Process: flowsheet notes for process teams

    August 7, 2026|

    Reviewed by Joe Ashwell

    Rox’s Youanmi gold adopts Glencore Albion Process: flowsheet notes for process teams

    First reported on International Mining – News

    30 Second Briefing

    Glencore Technology will install its Albion Process oxidative leaching circuit at Rox Resources’ Youanmi gold project in Western Australia to treat refractory and semi-refractory ores that are not amenable to conventional cyanidation. The fine-grinding plus oxygenated leach system is designed to oxidise sulphide-hosted gold at atmospheric pressure, offering a lower-capex alternative to pressure oxidation or roasting for “next generation” deposits. For process and geomet teams, this signals growing commercial acceptance of Albion flowsheets for challenging gold mineralogies in Australian hard-rock operations.

    Technical Brief

    • Albion circuit will be installed within Rox Resources’ planned processing plant at the Youanmi gold project.
    • Glencore Technology is supplying the proprietary oxidative leach package as a licensed technology provider.
    • Circuit design must accommodate both refractory and semi-refractory ore domains within the Youanmi resource model.

    Our Take

    Glencore Technology appears in multiple recent pieces in our database for pushing Jameson Cell and IsaMill solutions into more complex ore bodies, so deploying the Albion Process at the Youanmi gold project fits a pattern of the company targeting difficult mineralogy rather than bulk, conventional circuits.

    Among gold-related mining items in our coverage, Western Australia features frequently as a jurisdiction where refractory ore treatment routes are being commercialised, which suggests Rox Resources is unlikely to be alone in seeking oxidative pre-treatment options to unlock stranded ounces.

    With Glencore Technology already marketing its equipment as compatible with AI-driven advanced process control in other articles, there is a reasonable prospect that an Albion-based flowsheet at Youanmi could later be integrated with similar digital optimisation layers if Rox Resources wants to push recoveries or manage variable feed.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners
    Mining
    about 21 hours ago

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams
    Mining
    about 21 hours ago

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams

    South America’s Lithium Triangle holds about 64 million tonnes of identified lithium resources (43% of the global 150 million tonnes), yet geologist José Cabello’s review of 43 salt flats across Argentina, Bolivia and Chile shows that variable brine chemistry, impurities and groundwater behaviour make recovery and costs highly site-specific. Salar de Atacama benefits from ultra‑dry climate, relatively clean brines and strong logistics, while other basins such as Altoandinos, Pedernales, Hombre Muerto Oeste, Rincón, Sal de los Ángeles and Sal de Vida face tighter water and hydrogeological constraints. Direct lithium extraction (DLE) could unlock lower‑grade or impurity‑rich brines, but Cabello stresses that trade‑offs between brine withdrawal and freshwater consumption mean technology selection must be tailored to each basin’s hydrology and ecosystem.

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners
    Mining
    about 21 hours ago

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners

    EU regulators have granted strategic status under the Critical Raw Materials Act to KGHM’s 9.5‑billion‑zloty ($2.44bn) Retków‑Grodziszcze mine and Legnica smelter conversion, unlocking faster permitting, streamlined administration and access to preferential financing. Retków‑Grodziszcze is planned to deliver over 100 million tonnes of ore by 2055, yielding about 1.5 million tonnes of copper and 5,000 tonnes of silver, while Legnica’s recycling line targets 135,000 tonnes of electrolytic copper and 250 tonnes of nickel per year. The move materially boosts EU copper and nickel recycling capacity, central to the CRMA’s 25% recycling target.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental