Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Rajant–Epiroc Mexico mesh partnership: connectivity design notes for mine engineers

    July 23, 2026|

    Reviewed by Tom Sullivan

    First reported on International Mining – News

    30 Second Briefing

    Rajant Corporation and Epiroc Mexico have formed a strategic partnership to supply deployment-ready Kinetic Mesh® wireless networks integrated with Epiroc mining equipment across large open-pit operations in Mexico. The collaboration targets more reliable, high-bandwidth connectivity for mobile fleets, drilling rigs and autonomous or teleremote systems, with scope to extend the solution into Epiroc’s global mining portfolio. For engineers, this signals tighter coupling between OEM equipment and mine-wide mesh backbones, simplifying brownfield network upgrades and supporting higher data rates for real-time monitoring and control.

    Technical Brief

    • Similar OEM–network vendor tie-ups could reduce custom integration effort across other large mining operations.

    Our Take

    Rajant Corporation’s recent launch of the SLP-1025 Slipstream gateway and Hawk FE1-2450G triple-radio BreadCrumb® suggests that its JV with Epiroc Mexico is likely to leverage 5G-ready mesh hardware, which can materially improve connectivity for autonomous and semi-autonomous fleets in Mexican mines.

    Because this is framed as a JV rather than a simple supply agreement, Rajant Corporation and Epiroc Mexico are likely aiming at integrated, repeatable ‘connected mine’ packages, which can shorten deployment times for brownfield projects that lack robust wireless backbones.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    New Pacific Metals’ Carangas PEA update: economics and mine plan notes for engineers
    Mining
    about 2 hours ago

    New Pacific Metals’ Carangas PEA update: economics and mine plan notes for engineers

    New Pacific Metals has updated the PEA for its Carangas silver-gold-zinc-lead project in Bolivia, outlining a 19-year life of mine (plus two years’ pre-production) with total output of 195 Moz payable silver, 1.1 Moz gold, 1,453 Mlb zinc and 941 Mlb lead (339 Moz AgEq). The study gives a post-tax NPV of $3.23 billion and IRR of 37.0% at $5,100/oz gold, with initial capex of $644.5 million, LOM capex of $1.2 billion and a 2.4-year payback. Average AISC is $18.25/oz AgEq, with silver-dominant production of 15.5 Moz/year in years 1–8 before transitioning to 7.6 Moz Ag and 142.7 koz Au per year in years 9–16.

    Nth Cycle SPAC merger: electro-extraction scale-up lens for mine planners
    Mining
    about 2 hours ago

    Nth Cycle SPAC merger: electro-extraction scale-up lens for mine planners

    Nth Cycle will go public via a merger with SPAC Kensington Capital Acquisition Corp. VI (NYSE: KCAC), valuing the critical minerals refiner at $585 million and targeting up to $330 million in gross proceeds from Kensington’s trust and a common stock PIPE. The combined entity, Nth Cycle Holdings, Inc., will trade on the NYSE under ticker “NTH” and scale its modular ‘Oyster’ electro-extraction units, which selectively recover nickel, cobalt, rare earths, copper and other battery metals from scrap, end-of-life batteries and mined rock. A previously signed 10-year, approximately $1.1 billion offtake agreement with Trafigura underpins commercial deployment.

    ICMM water risk dataset: key exposure and process impacts for mine planners
    Mining
    about 2 hours ago

    ICMM water risk dataset: key exposure and process impacts for mine planners

    ICMM’s new global dataset of 12,000 mining and metals facilities across 148 countries shows 65.7% operate in areas with significant physical water risk, with 38.2% in catchments of high baseline water stress, 27% exposed to high drought risk and 14% to high flood risk. Exposure is highly uneven, with 85.8% of Chilean facilities in high-stress catchments and similarly elevated levels in Africa and the Middle East. ICMM warns that poorly understood water risk could constrain water-intensive processes such as crushing, flotation, leaching and tailings management, tightening supply for the energy transition.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy