Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Queensland Mining & Engineering Exhibition 2026: key takeaways for site engineers

    July 21, 2026|

    Reviewed by Joe Ashwell

    Queensland Mining & Engineering Exhibition 2026: key takeaways for site engineers

    First reported on Australian Mining

    30 Second Briefing

    Queensland Mining & Engineering Exhibition 2026 has opened in Mackay, returning to the Mackay Showgrounds with its largest footprint yet, including an expanded 9000m² exhibition area. The three-day event brings together Queensland and national miners, OEMs and service providers to showcase new technology, with a strong focus on equipment, automation and decarbonisation solutions for coal and metalliferous operations. For engineers, QME offers direct access to suppliers, live demonstrations and technical discussions concentrated in a single regional hub.

    Technical Brief

    • Three‑day format compresses multiple procurement, technical and maintenance meetings into a single travel window for site engineers.

    Our Take

    Across our database of 1237 Mining stories, QME is one of the few recurring event-focused entries where the exhibition footprint (9000 square metres at the Mackay Showgrounds) is tracked, signalling that OEMs and METS suppliers treat it as a major launch platform rather than a regional roadshow.

    The run of related QME pieces from March through July 2026, all noting sold-out or expanded floor space, suggests sustained vendor demand that contractors and mine operators in Queensland can use to benchmark which technologies are gaining commercial traction before committing to site trials.

    With no specific commodity focus in QME coverage and repeated mention of underground coal, METS and decarbonisation themes in earlier related articles, the Mackay-based event is effectively functioning as a cross-commodity technology marketplace for Queensland operations rather than a coal-only forum.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 4 hours ago

    RME–Novo Tellus deal: what the new backing means for mill relining reliability

    Mill relining systems OEM RUSSELL MINERAL EQUIPMENT has completed the final milestone of its transitional sale agreement with Resource Capital Funds, bringing Singapore-based industrial and technology investor Novo Tellus onto the share register. The deal, signed on 16 November 2024, secures new growth capital for RME’s specialised mill relining machines and liner handling systems used on large SAG and ball mills worldwide. For mine operators, the move signals continued OEM backing for high-availability relining services and potential acceleration of automation and digital tooling across shutdown-critical mill maintenance.

    Mining
    about 4 hours ago

    Eldorado’s Skouries first ore milestone: commissioning insights for mine planners

    Eldorado Gold has fed first ore through the crushing circuit at its Skouries copper-gold project in northern Greece, marking the transition from construction to commissioning. The company reports that Skouries is in the final stages of build-out and is targeting first production of copper-gold concentrate in the September quarter of 2026. For mine planners and process engineers, the milestone confirms that primary crushing infrastructure is mechanically complete and that downstream concentrator commissioning is imminent.

    Heidelberg’s Westdown quarry reopening: output, haulage and habitat notes for engineers
    Mining
    about 5 hours ago

    Heidelberg’s Westdown quarry reopening: output, haulage and habitat notes for engineers

    Heidelberg Materials UK has secured planning conditions from Somerset Council to reopen the 160m‑tonne Westdown limestone quarry near Frome, with site preparations starting autumn 2026 and production targeted for the second half of 2027. Operations will be confined to the former quarry boundary, with hedgerows and edge woodland retained, plus 44 acres of new habitat and native broadleaved planting on screening bunds to create species‑rich connected woodland and grassland. Combined aggregate output from Westdown and the nearby rail‑connected Whatley quarry will not exceed Whatley’s current permitted tonnage, with Whatley focusing on national rail markets to reduce HGV traffic through local villages.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy