Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Safety

    NTT remote mining at Codelco’s El Teniente: design and risk notes for engineers

    August 7, 2026|

    Reviewed by Joe Ashwell

    NTT remote mining at Codelco’s El Teniente: design and risk notes for engineers

    First reported on MINING.com

    30 Second Briefing

    Japanese telecommunications firm NTT Docomo Business is testing its IOWN All-Photonics Network at Codelco’s El Teniente, linking the underground mine to a remote operations centre in Rancagua about 1,500 km away to run heavy equipment and high-definition video over a high-capacity, low-latency optical network. The ministry-backed proof of concept targets remote operation, consolidation of control rooms and reduced underground exposure amid Codelco’s heightened focus on seismic risk after deeper Andes Norte studies revealed higher-than-expected hazards. If performance is proven, NTT plans to roll out IOWN-based remote operation models to other mining and energy projects globally.

    Technical Brief

    • NTT Docomo Business is trialling its IOWN All-Photonics Network (APN) specifically for heavy equipment teleoperation.
    • The proof-of-concept is commissioned and funded under Japan’s Ministry of Internal Affairs and Communications.
    • Management is explicitly targeting reduced underground exposure amid shortages of skilled equipment operators willing to work at depth.
    • NTT plans to port validated IOWN APN safety/remote-operation configurations to other mining and energy assets worldwide.

    Our Take

    Our recent coverage shows Codelco simultaneously pausing deep expansion at the Andes Norte section of El Teniente for up to two years over seismic concerns, so NTT Docomo Business’ remote‑operation work is likely being evaluated as part of a broader risk‑management rethink rather than a stand‑alone tech trial.

    With copper prices in our database hovering near record levels and tight physical supply repeatedly highlighted, any successful remote mining deployment at El Teniente in Chile could help Codelco stabilise output without pushing workers further into the higher‑risk deep zones flagged in July’s seismic studies.

    Japan’s involvement via NTT and the Ministry of Internal Affairs and Communications aligns with other critical‑minerals security moves in our coverage, suggesting Tokyo is using remote‑operation know‑how at overseas copper assets like El Teniente to secure influence over upstream supply without direct ownership stakes.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    US DOE $73M Mine of the Future funding: key testbed insights for engineers
    Mining
    about 5 hours ago

    US DOE $73M Mine of the Future funding: key testbed insights for engineers

    The US Department of Energy has awarded US$73 million through its Mine of the Future initiative to four projects creating national-scale mining testbeds in West Virginia, Colorado, Arizona, Missouri and Texas. Innovative Wireless Technologies will integrate underground and surface sites in Julian, Blacksburg and Idaho Springs to validate next‑generation digital, connectivity and automation systems, while the University of Arizona and University of Missouri will build underground and comminution proving grounds focused on electrification and energy management. Southern Methodist University will repurpose a heavily instrumented Navasota drilling site into a “synthetic mine” for repeatable testing of drilling, sensing and autonomous workflows, aiming to de‑risk commercial deployment.

    Mining leads Canadian PM’s C$1T pitchbook: project finance signals for engineers
    Mining
    about 5 hours ago

    Mining leads Canadian PM’s C$1T pitchbook: project finance signals for engineers

    Mining projects dominate Prime Minister Mark Carney’s leaked C$1 trillion, five‑year investment pitchbook, with 63 of 167 opportunities spanning lithium, nickel, graphite, rare earths, gold and copper, and including proposals such as Canada’s first uranium refining and conversion plant in more than 40 years. Confirmed entries range from LithiumBank’s Boardwalk lithium brine project in Alberta, with 5.2 million measured and indicated tonnes LCE at 81.6 mg/L, to Surge Copper’s Berg copper‑molybdenum project, scoped for a 28‑year life and 176 million lb copper per year. Despite a 75% year‑on‑year rise to C$10.1 billion in TSX/TSXV mining equity raisings, pension and sovereign funds remain cautious on finite‑life mines, making long‑life assets and midstream processing plants more likely to secure capital.

    Cyclic Materials’ Mesa rare earth recycling plant: process and scale notes for engineers
    Mining
    about 5 hours ago

    Cyclic Materials’ Mesa rare earth recycling plant: process and scale notes for engineers

    Cyclic Materials has opened a 144,000-square-foot rare earth magnet recycling plant in Mesa, Arizona, designed to process up to 25,000 tonnes per year of magnet-bearing end-of-life products using its proprietary MagCycle mechanical separation technology. The feedstock-agnostic facility is already running at 8 tonnes per hour, producing Mag-Xtract rare earth magnet material and recovering copper, aluminium and steel for sale to US smelters, with over 7,000 tonnes of material already delivered. Backed by more than US$20 million in investment, the plant is intended as a replicable model ahead of a planned South Carolina rare earth recycling campus.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental