Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Research
    Sustainability

    New CRC for Australia’s critical minerals: refining flowsheets and risks for engineers

    March 9, 2026|

    Reviewed by Joe Ashwell

    New CRC for Australia’s critical minerals: refining flowsheets and risks for engineers

    First reported on Australian Mining

    30 Second Briefing

    The Federal Government will provide $53 million to establish a new Cooperative Research Centre focused on boosting Australia’s critical minerals refining capability, targeting value-adding beyond raw lithium, rare earths and other battery and magnet metals. The CRC is expected to link universities, CSIRO and industry to develop refining flowsheets, pilot-scale processing and advanced materials, building domestic capability in hydrometallurgy, separation technologies and product qualification. For miners and processors, this signals stronger support for downstream projects, process innovation and local supply chains for cathode, permanent magnet and alloy precursors.

    Technical Brief

    • Research methods are expected to combine laboratory leach/solvent extraction campaigns with flowsheet simulation and techno‑economic modelling.
    • Data inputs will likely include ore characterisation, impurity deportment, reagent consumption, energy balance and product qualification test results.
    • Outputs are intended to feed directly into bankable feasibility studies for new or expanded refining plants.
    • Scope is limited to downstream refining and advanced materials; primary mining and exploration remain outside its mandate.
    • Industry trend implication: supports onshore conversion of concentrates currently exported to offshore refineries, reducing logistics and offtake risk.

    Our Take

    Critical minerals pieces in our database increasingly sit under both the ‘Projects’ and ‘Research’ tags, signalling that Australian work is moving from pure exploration into process flowsheet development and pilot-scale refining rather than just mine approvals.

    Within the 117 critical-minerals‑tagged items, Australia features heavily as a host country, which suggests that any new refining-focused CRC is likely to influence not just domestic project pipelines but also how offtake partners view Australian value-added capacity versus raw concentrate exports.

    Sustainability-tagged mining coverage in our database often links critical minerals to lifecycle emissions and ESG credentials, so a refining-oriented CRC in Australia is likely to prioritise low-carbon processing routes and traceability, which can materially improve project bankability for local operators.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 18 hours ago

    Sandvik mining leadership change: drill fleet strategy takeaways for engineers

    Sandvik has appointed Patrick Murphy as President of its Mining business area and member of Sandvik Group Executive Management, effective 1 July 2026, succeeding Mats Eriksson, who will step down ahead of his planned 2027 retirement. Murphy currently leads Sandvik’s Rotary Drilling division, giving him direct oversight of blasthole and production drilling systems that are central to large open-pit operations. The leadership change signals continuity in Sandvik’s mining equipment strategy, particularly around drill fleet technology and service models for high-production sites.

    Torex Mexico gold mine life extension: drilling and throughput lens for planners
    Mining
    about 19 hours ago

    Torex Mexico gold mine life extension: drilling and throughput lens for planners

    New drilling at Torex Gold Resources’ Morelos complex in Mexico has intersected high-grade zones, including 18 metres at 8.04 g/t gold, 33.9 g/t silver and 1.37% copper in hole MLLI-042 and 16 metres at 15.12 g/t gold in hole MLLI-048, both from depths around 470–565 metres. Additional intercepts such as 49 metres at 2.18 g/t gold and 95 metres at 1.5 g/t gold support continuity of mineralisation to at least 700 metres above sea level, remaining open at depth and along strike. Backed by a record US$77 million 2026 exploration budget and 148,000 metres of planned drilling, Torex aims to sustain 450,000–500,000 gold-equivalent oz. per year beyond 2030 by rapidly tying Media Luna, ELG underground and satellite deposits into existing plant infrastructure.

    Iran war and nuclear build‑out: uranium market signals for mine planners
    Mining
    about 19 hours ago

    Iran war and nuclear build‑out: uranium market signals for mine planners

    War in Iran and a May 2025 US executive order to quadruple nuclear capacity to about 400 GW by 2050 are fuelling expectations of a new wave of reactor construction, with uranium demand already exceeding mine output by 50–60 million lb. per year. Cameco, which produces about 15% of global uranium from assets including the McArthur River high‑grade mine and owns 49% of Westinghouse Electric, has signed a nine‑year, ~22‑million‑lb. uranium supply deal with India worth an estimated US$1.9 billion from 2027–2035. Spot uranium is trading near US$86/lb., term prices around US$90/lb., and utilities are beginning to accept three‑digit pricing as long‑term uncovered requirements through 2045 widen.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental