Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability
    Safety

    Minera Los Pelambres tyre recycling milestone: compliance lessons for mine operators

    November 14, 2026|

    Reviewed by Joe Ashwell

    First reported on International Mining – News

    30 Second Briefing

    Minera Los Pelambres, operated by Antofagasta Minerals in Chile, has been recognised by Michelin NFU for recycling and recovering end-of-life ultra-class mining tyres at 240% above the target set by Chile’s Extended Producer Responsibility (REP) Law. The programme covers large off-the-road (OTR) tyres from haul trucks and auxiliary equipment, diverting them from on-site stockpiles to authorised processing facilities for material recovery. For mine operators, the case shows how formal producer–user agreements under REP-style regulations can de-risk tyre legacy liabilities and tighten compliance on waste tracking.

    Technical Brief

    • For other mines, the case illustrates how REP-compliant tyre chains can standardise safe end-of-life handling.

    Our Take

    Within our 2,538 sustainability- and safety-tagged pieces, tyre recycling initiatives by majors like Antofagasta Minerals remain relatively rare, so Minera Los Pelambres’ overachievement signals that end-of-life tyre management is moving from pilot-scale to operational practice at large open pits.

    A 240% overrun on a mining tyre recycling target suggests Minera Los Pelambres and Michelin NFU have more processing capacity or logistics reliability than initially assumed, which could allow Antofagasta Minerals to extend similar contracts or models to other operations without major redesign.

    For operators tracking ESG performance, hitting tyre recycling metrics at this scale can materially reduce visible waste stockpiles on site, which often feature in community and regulator audits even when they are not yet formal permit constraints.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Freeport’s $77M Aurora West copper stake: project and drilling lens for mine planners
    Mining
    about 2 hours ago

    Freeport’s $77M Aurora West copper stake: project and drilling lens for mine planners

    Freeport-McMoRan has agreed to pay $77.2 million for 51% of TDG Gold’s Aurora West project in British Columbia, with options to lift its stake to 75% in the Aurora West JV and 100% in a separate ClaimsCo by funding $80 million in exploration and paying a further $40 million. The deal consolidates ground around the Aurora copper-gold discovery in the Toodoggone district, where Freeport already funds a 630 sq. km programme with Amarc Resources and has drilled almost 14,000 m in 16 holes. TDG retains 25% of the JV plus a 2% NSR on specified claims and will use proceeds to advance its Shasta gold-silver project without new equity.

    Capstone Copper cuts outlook as Pinto Valley restart slips: reliability lens for engineers
    Mining
    about 2 hours ago

    Capstone Copper cuts outlook as Pinto Valley restart slips: reliability lens for engineers

    Capstone Copper has cut its 2026 copper production floor by 5,000 tonnes to 195,000 tonnes after delaying full restart of the Pinto Valley mine in Arizona to mid-December due to additional primary crusher repairs, with OEM-fabricated mechanical components still off-site. Interim mobile crushers are expected to process up to 40,000 tonnes per day, about two-thirds of Pinto Valley’s 60,000‑tonne‑per‑day concentrator capacity, following Q3 output of 6,358 tonnes versus 9,949 tonnes a year earlier. A national truckers’ strike in Chile is adding logistics risk for fuel and sulphuric acid supply to Mantoverde and Mantos Blancos, compounding concerns over operational reliability into 2027.

    Modern Mining NYSE American debut: e-waste feedstock and process notes for engineers
    Mining
    about 2 hours ago

    Modern Mining NYSE American debut: e-waste feedstock and process notes for engineers

    Modern Mining began trading on the NYSE American under ticker “MDRN” after a roughly US$40 million IPO, closing its first day down 3.5% with a market capitalisation of about US$36.1 million. The company uses a proprietary aqueous-based process to recover gold, silver, copper, palladium and other metals from electronic waste, targeting above-ground feedstock from discarded electronics. CEO Jeet Basi said the listing and new capital will be used to scale processing capacity as the US seeks to retain more critical mineral-bearing material domestically.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental