Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product
    Contract Award

    Metso’s Viscaria copper mine restart package: flowsheet and tie-in notes for engineers

    September 8, 2026|

    Reviewed by Joe Ashwell

    First reported on International Mining – News

    30 Second Briefing

    Metso has signed an agreement with Gruvaktiebolaget Viscaria to supply key copper and iron ore process equipment for the restart of the Viscaria mine in Kiruna, Sweden, enabling the project to move into its execution phase. The plant is designed for 120,000 t/y of copper concentrate, positioning Viscaria to become Sweden’s second-largest copper producer. For process and plant engineers, the deal signals imminent demand for detailed flowsheet integration, brownfield tie-ins and Nordic-standard power, water and tailings interfaces.

    Technical Brief

    • Metso’s involvement at execution phase typically includes process guarantees, influencing plant availability and ramp-up risk.
    • For similar brownfield restarts in Scandinavia, such OEM packages often anchor project financing and schedule certainty.

    Our Take

    Metso’s award at the Viscaria copper mine in Sweden sits alongside recent process packages for Troilus (copper-gold) and the New Simberi Gold Project, signalling that its flowsheet designs are increasingly being standardised across copper and gold circuits in very different climatic and regulatory environments.

    With Viscaria combining copper and iron ore in Kiruna, Metso’s work with GTK Mintec’s circular-economy pilot plant in Finland suggests the company is positioning Nordic projects as a test bed for more integrated processing and by-product recovery concepts.

    In our database of 1289 Mining stories, copper appears frequently in Metso-related contract awards, and the Finnvera-backed Troilus equipment financing indicates that similar export credit structures could be explored for Nordic copper projects like Viscaria if large-scale Metso packages are involved.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 1 hour ago

    PROK Johannesburg idler plant: supply-chain and design notes for mine engineers

    PROK has opened a new idler manufacturing facility in Johannesburg to supply conveyor components for African mining and bulk materials handling operations. The plant will produce PROK’s conveyor idlers and rollers locally, reducing lead times compared with imports and supporting large overland and in-plant conveyor installations. The investment signals a push for regionalised supply of wear-critical components, which could improve availability and lifecycle support for high-capacity conveyor systems in South African and neighbouring mines.

    Mining
    about 1 hour ago

    KGHM–BHP copper MoU: exploration JV implications for project engineers

    KGHM Polska Miedź SA and BHP, via BHP World Exploration Inc, have signed a Memorandum of Understanding to create a formal framework for cooperation on copper-focused exploration and development projects. The MoU initiates structured technical dialogue between the two majors on potential joint work, likely covering greenfield targeting, resource definition drilling and project evaluation. For engineers, the move signals possible future collaboration on large-scale porphyry copper systems, shared geoscience datasets and standardised approaches to resource modelling and project development.

    Mining
    about 1 hour ago

    Viridis Colossus rare earths filter order: tailings design notes for engineers

    Viridis Mining and Minerals has placed its first major equipment order for the Colossus Rare Earth Project in Brazil, selecting a residue pressure filtration package from specialist clay filter press manufacturer Dewater Filter Press Srl of Cagli, Italy. The large pressure filter will handle clay-rich rare earth residues, a critical step for achieving low-moisture filter cakes suitable for dry stacking or controlled storage. The order signals Viridis’ move from project development towards an engineered flowsheet and defined tailings and residue management strategy.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental