Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Viridis Colossus rare earths filter order: tailings design notes for engineers

    September 8, 2026|

    Reviewed by Tom Sullivan

    First reported on International Mining – News

    30 Second Briefing

    Viridis Mining and Minerals has placed its first major equipment order for the Colossus Rare Earth Project in Brazil, selecting a residue pressure filtration package from specialist clay filter press manufacturer Dewater Filter Press Srl of Cagli, Italy. The large pressure filter will handle clay-rich rare earth residues, a critical step for achieving low-moisture filter cakes suitable for dry stacking or controlled storage. The order signals Viridis’ move from project development towards an engineered flowsheet and defined tailings and residue management strategy.

    Technical Brief

    • Dewater Filter Press Srl, based in Cagli, Italy, specialises in high-pressure clay filter presses.

    Our Take

    Viridis Mining and Minerals’ Colossus rare earths project in Brazil sits directly within the new National Policy for Critical and Strategic Minerals approved by Brazil’s Senate (7 Sept 2026), meaning any future change of control or major strategic investor at Colossus is likely to face review by the planned presidential council.

    In our database of rare earths coverage, Brazil appears alongside Canada’s Defense Metals and Brazil’s Serra Verde as one of the few non-Chinese jurisdictions advancing sizeable rare earth projects, which could give Colossus leverage in future offtake or financing discussions as Western demand for non-Chinese supply grows.

    The combination of a Brazilian rare earths project and an Italian supplier (Dewater Filter Press Srl) reflects the cross-Atlantic supply chain pattern seen across other critical-mineral stories in our coverage, where processing and equipment know‑how still tends to come from Europe even as ore bodies are developed in South America.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 1 hour ago

    PROK Johannesburg idler plant: supply-chain and design notes for mine engineers

    PROK has opened a new idler manufacturing facility in Johannesburg to supply conveyor components for African mining and bulk materials handling operations. The plant will produce PROK’s conveyor idlers and rollers locally, reducing lead times compared with imports and supporting large overland and in-plant conveyor installations. The investment signals a push for regionalised supply of wear-critical components, which could improve availability and lifecycle support for high-capacity conveyor systems in South African and neighbouring mines.

    Mining
    about 1 hour ago

    KGHM–BHP copper MoU: exploration JV implications for project engineers

    KGHM Polska Miedź SA and BHP, via BHP World Exploration Inc, have signed a Memorandum of Understanding to create a formal framework for cooperation on copper-focused exploration and development projects. The MoU initiates structured technical dialogue between the two majors on potential joint work, likely covering greenfield targeting, resource definition drilling and project evaluation. For engineers, the move signals possible future collaboration on large-scale porphyry copper systems, shared geoscience datasets and standardised approaches to resource modelling and project development.

    Mining
    about 1 hour ago

    Metso’s Viscaria copper mine restart package: flowsheet and tie-in notes for engineers

    Metso has signed an agreement with Gruvaktiebolaget Viscaria to supply key copper and iron ore process equipment for the restart of the Viscaria mine in Kiruna, Sweden, enabling the project to move into its execution phase. The plant is designed for 120,000 t/y of copper concentrate, positioning Viscaria to become Sweden’s second-largest copper producer. For process and plant engineers, the deal signals imminent demand for detailed flowsheet integration, brownfield tie-ins and Nordic-standard power, water and tailings interfaces.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental