Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product
    Safety

    Metso digital solutions launch: production and safety insights for mine engineers

    September 10, 2026|

    Reviewed by Tom Sullivan

    Metso digital solutions launch: production and safety insights for mine engineers

    First reported on International Mining – News

    30 Second Briefing

    Metso has expanded its Metso Digital portfolio with three new platforms – Digital Production Management, Data-driven Performance Analytics and Safety Performance Platform – aimed at turning plant and fleet data into actionable production and safety decisions. Digital Production Management targets end-to-end throughput optimisation across crushing, grinding and downstream circuits, while Data-driven Performance Analytics applies advanced analytics to equipment condition and process KPIs. The Safety Performance Platform centralises incident, near-miss and behavioural data to support risk control and compliance in large, multi-site mining operations.

    Technical Brief

    • Metso’s Safety Performance Platform centralises incident, near-miss and behavioural observations into a single structured database.
    • Configurable workflows allow site-specific approval chains for incidents, corrective actions and risk sign-offs.
    • Role-based access controls segregate HSE, operations and contractor data, supporting corporate governance requirements.
    • Time-stamped event logging enables reconstruction of incident timelines across shifts, crews and mobile equipment.
    • Standardised taxonomies for event types and causes support consistent reporting across multi-site mining portfolios.
    • Integration with fleet and plant control systems links safety events to operating states and production conditions.
    • Analytics dashboards expose leading indicators (e.g. unsafe acts, repeat deviations) rather than only lost-time injuries.
    • For large miners, such platforms support harmonised safety KPIs and audit trails across jurisdictions and regulators.

    Our Take

    Metso features heavily in recent project and product coverage in our database, from supplying key process equipment for the Viscaria copper-iron ore restart in Sweden (8 Sept 2026) to the first commercial-scale DRI Smelting Furnace for Eti Bakir in Türkiye (7 Sept 2026), signalling a push to pair hardware deliveries with higher-value digital and analytics layers like these new platforms.

    The addition of Metso Safety Performance Platform sits alongside multiple safety-tagged items in our mining corpus and is likely to appeal to lenders and export credit agencies such as Finnvera, which is already linked to Metso’s $155 million mineral processing supply for Troilus, where demonstrable safety and operational controls can support financing and ESG narratives.

    Digital Production Management and Data-driven Performance Analytics are well-timed for Metso’s growing installed base in mobile crushing and screening, as seen in the recent Lokotrack LT400RS and LT200HPX rollout in the UK and Ireland, giving the company a route to ongoing optimisation contracts rather than one-off equipment sales.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners
    Mining
    about 2 hours ago

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams
    Mining
    about 2 hours ago

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams

    South America’s Lithium Triangle holds about 64 million tonnes of identified lithium resources (43% of the global 150 million tonnes), yet geologist José Cabello’s review of 43 salt flats across Argentina, Bolivia and Chile shows that variable brine chemistry, impurities and groundwater behaviour make recovery and costs highly site-specific. Salar de Atacama benefits from ultra‑dry climate, relatively clean brines and strong logistics, while other basins such as Altoandinos, Pedernales, Hombre Muerto Oeste, Rincón, Sal de los Ángeles and Sal de Vida face tighter water and hydrogeological constraints. Direct lithium extraction (DLE) could unlock lower‑grade or impurity‑rich brines, but Cabello stresses that trade‑offs between brine withdrawal and freshwater consumption mean technology selection must be tailored to each basin’s hydrology and ecosystem.

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners
    Mining
    about 2 hours ago

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners

    EU regulators have granted strategic status under the Critical Raw Materials Act to KGHM’s 9.5‑billion‑zloty ($2.44bn) Retków‑Grodziszcze mine and Legnica smelter conversion, unlocking faster permitting, streamlined administration and access to preferential financing. Retków‑Grodziszcze is planned to deliver over 100 million tonnes of ore by 2055, yielding about 1.5 million tonnes of copper and 5,000 tonnes of silver, while Legnica’s recycling line targets 135,000 tonnes of electrolytic copper and 250 tonnes of nickel per year. The move materially boosts EU copper and nickel recycling capacity, central to the CRMA’s 25% recycling target.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental