Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Master Drilling–Boliden Somincor raiseboring: design and planning notes for mine engineers

    September 10, 2026|

    Reviewed by Tom Sullivan

    Master Drilling–Boliden Somincor raiseboring: design and planning notes for mine engineers

    First reported on International Mining – News

    30 Second Briefing

    Master Drilling has secured its first Portuguese contract from copper-zinc producer Boliden Somincor to construct two raisebored shafts, each 630 m deep and 4.5 m in diameter. The twin vertical excavations will be critical for long-term hoisting, ventilation or service access, demanding precise control of deviation over the full 630 m and careful management of rock stability around the 4.5 m diameter openings. For geotechnical and mine planning teams, the project signals growing availability of large-diameter raiseboring capacity in European base metal operations.

    Technical Brief

    • Contract is Master Drilling’s first deployment of large-diameter raiseboring services in Portugal.
    • Award extends Master Drilling’s European footprint beyond existing operations in other base-metal jurisdictions.
    • Twin-shaft package implies coordinated scheduling of rig mobilisation, reaming passes and mucking logistics underground.
    • Raiseboring solution avoids full-length conventional shaft sinking, reducing exposure to underground drilling and blasting.
    • Long-term contract value and capex are undisclosed, but scope suggests multi-year execution and commissioning horizon.
    • For other European mining projects, availability of this capacity may de-risk future deepening or expansion studies.

    Our Take

    Our coverage shows Boliden Somincor’s Neves‑Corvo zinc and copper operation in Portugal is already being used as a testbed for underground automation and battery‑electric support equipment, so awarding a 630‑m, 4.5‑m raiseboring scope to Master Drilling aligns with a pattern of deploying advanced, specialist contractors at this site.

    Master Drilling’s recent work with remote raiseboring at Agnico Eagle’s Odyssey mine in Canada suggests that similar remote or semi‑autonomous practices could be applied to these two deep shafts in Portugal, which would be attractive for a highly mechanised copper‑zinc operation like Somincor.

    The combination of this shaft work with Boliden Somincor’s large on‑site solar UPAC project near Neves‑Corvo signals that long‑life copper and zinc infrastructure in Portugal is being planned around both deeper underground access and lower‑carbon power, which can strengthen the mine’s cost and ESG positioning within European base‑metal supply.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners
    Mining
    about 3 hours ago

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams
    Mining
    about 3 hours ago

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams

    South America’s Lithium Triangle holds about 64 million tonnes of identified lithium resources (43% of the global 150 million tonnes), yet geologist José Cabello’s review of 43 salt flats across Argentina, Bolivia and Chile shows that variable brine chemistry, impurities and groundwater behaviour make recovery and costs highly site-specific. Salar de Atacama benefits from ultra‑dry climate, relatively clean brines and strong logistics, while other basins such as Altoandinos, Pedernales, Hombre Muerto Oeste, Rincón, Sal de los Ángeles and Sal de Vida face tighter water and hydrogeological constraints. Direct lithium extraction (DLE) could unlock lower‑grade or impurity‑rich brines, but Cabello stresses that trade‑offs between brine withdrawal and freshwater consumption mean technology selection must be tailored to each basin’s hydrology and ecosystem.

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners
    Mining
    about 3 hours ago

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners

    EU regulators have granted strategic status under the Critical Raw Materials Act to KGHM’s 9.5‑billion‑zloty ($2.44bn) Retków‑Grodziszcze mine and Legnica smelter conversion, unlocking faster permitting, streamlined administration and access to preferential financing. Retków‑Grodziszcze is planned to deliver over 100 million tonnes of ore by 2055, yielding about 1.5 million tonnes of copper and 5,000 tonnes of silver, while Legnica’s recycling line targets 135,000 tonnes of electrolytic copper and 250 tonnes of nickel per year. The move materially boosts EU copper and nickel recycling capacity, central to the CRMA’s 25% recycling target.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental