Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Safety
    Product

    Martin Engineering belt cleaner positioning: practical guidance for mine conveyors

    October 22, 2026|

    Reviewed by Joe Ashwell

    Martin Engineering belt cleaner positioning: practical guidance for mine conveyors

    First reported on International Mining – News

    30 Second Briefing

    Belt cleaner specialist Martin Engineering, led by R. Todd Swinderman (President Emeritus, CEMA), sets out guidance for positioning primary, secondary and tertiary cleaners on high‑volume conveyors where structural steelwork, limited chute space and access platforms often prevent ideal installation. The guidance focuses on locating primary cleaners at the head pulley, secondary units on the return strand just beyond the discharge, and tertiary or wash‑box systems further downstream to control carryback. Swinderman stresses that safe maintenance access, adequate mounting distance from pulleys and integration with existing transfer‑point geometry are critical design constraints.

    Technical Brief

    • Recommendations address high-volume belts where carryback can overload receiving conveyors and transfer chutes downstream.

    Our Take

    Across recent Mining coverage, Martin Engineering repeatedly appears in safety-tagged pieces on conveyors, dust and blockage control, signalling a deliberate push to frame its products as engineered risk-reduction measures rather than just wear parts.

    The cluster of International Mining articles on Martin Engineering’s chute sealing, blockage mitigation and now belt cleaners suggests operators are increasingly looking at the conveyor system as an integrated material-handling and safety asset, not a set of standalone components to be maintained in isolation.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 2 hours ago

    Hudbay–Mitsubishi Copper World Arizona: design and risk notes for mine planners

    Hudbay Minerals and Mitsubishi Corporation have approved development of the Copper World project in Arizona after completing a definitive feasibility study and related prefeasibility work, positioning it as one of the largest open-pit copper mines in the US. The DFS defines a large-scale open pit with associated concentrator and downstream facilities sized for long-life production, though detailed tonnage and throughput figures have not yet been released. For geotechnical and mine planning teams, the decision signals imminent detailed design of pit slopes, waste dumps and water management for a Tier-1 scale operation in arid conditions.

    Mining
    about 2 hours ago

    Thiess Mongolia contracts at Oyu Tolgoi and Ukhaa Khudag: key points for mine planners

    Thiess has secured two five-year contracts in Mongolia to deliver underground mining services at Rio Tinto–managed Oyu Tolgoi and asset management services for Energy Resources’ Ukhaa Khudag coal mine. The Oyu Tolgoi scope centres on long-term underground development and production support at one of the world’s largest copper-gold deposits, while Ukhaa Khudag work focuses on maintaining a large truck–shovel fleet and fixed plant. The deals extend Thiess’ Mongolian presence and signal continued demand for outsourced underground and maintenance expertise in complex brownfield operations.

    Mining
    about 2 hours ago

    Merdeka Sulawesi RopeCon® contract: design and haulage lessons for mine planners

    PT Pani Industri Nusantara, a subsidiary of PT Merdeka Copper Gold Tbk, has awarded Doppelmayr a contract to install Indonesia’s first RopeCon® system to move crushed gold ore from its Sulawesi mine directly to a carbon-in-leach processing plant. The fixed elevated conveyor-ropeway hybrid is designed to span difficult terrain with minimal tower foundations, reducing haul road construction and diesel truck use. For mine planners and geotechnical teams, the choice signals a shift towards long-distance, low-footprint ore transport in steep, infrastructure-poor topography.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental