Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Contract Award
    Projects

    Macmahon’s $240m Ravensthorpe underground: scope and risk notes for mine engineers

    August 12, 2026|

    Reviewed by Tom Sullivan

    Macmahon’s $240m Ravensthorpe underground: scope and risk notes for mine engineers

    First reported on Australian Mining

    30 Second Briefing

    Macmahon Underground has been named preferred tenderer for a proposed $240 million underground mining contract at Medallion Metals’ Ravensthorpe gold project in Western Australia, covering portal establishment, primary development, production and associated works. The scope points to a full-service underground package likely including decline access, level development and stoping infrastructure, consolidating Macmahon’s presence in WA hard-rock gold. Final award remains subject to contract execution, so detailed schedules, equipment deployment and ground support strategies are yet to be confirmed.

    Technical Brief

    • Scope bundles both development and production activities into a single integrated underground services package.
    • Contract award remains conditional on final commercial agreement and formal execution between Medallion and Macmahon.
    • Selection of a preferred tenderer signals transition from study phase towards execution planning for underground works.
    • Ravensthorpe project location in WA implies typical constraints of remote logistics, workforce access and supply chains.
    • Integrated contract structure can simplify interface risk between decline development, level access and stoping operations.

    Our Take

    Macmahon Underground’s recent wins at the Mt Marion lithium operation and the Central Tanami gold project suggest it is consolidating a strong underground services pipeline in Western Australia and the broader interior, which can give Medallion Metals access to a contractor with current regional cost and labour benchmarks.

    The helicopter-borne EM survey Medallion Metals is running over the Ravensthorpe gold project indicates the resource model is still being actively refined, so locking in a preferred underground contractor at this stage likely aims to shorten the study‑to‑development transition once targets are converted to mineable inventory.

    Within our 1280 Mining stories, gold projects in Western Australia appear frequently in the Projects and Contract Award tags, signalling that Ravensthorpe will be competing for underground crews and equipment in a relatively tight local contractor market where Macmahon Underground already has multiple commitments.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners
    Mining
    about 17 hours ago

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams
    Mining
    about 17 hours ago

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams

    South America’s Lithium Triangle holds about 64 million tonnes of identified lithium resources (43% of the global 150 million tonnes), yet geologist José Cabello’s review of 43 salt flats across Argentina, Bolivia and Chile shows that variable brine chemistry, impurities and groundwater behaviour make recovery and costs highly site-specific. Salar de Atacama benefits from ultra‑dry climate, relatively clean brines and strong logistics, while other basins such as Altoandinos, Pedernales, Hombre Muerto Oeste, Rincón, Sal de los Ángeles and Sal de Vida face tighter water and hydrogeological constraints. Direct lithium extraction (DLE) could unlock lower‑grade or impurity‑rich brines, but Cabello stresses that trade‑offs between brine withdrawal and freshwater consumption mean technology selection must be tailored to each basin’s hydrology and ecosystem.

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners
    Mining
    about 17 hours ago

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners

    EU regulators have granted strategic status under the Critical Raw Materials Act to KGHM’s 9.5‑billion‑zloty ($2.44bn) Retków‑Grodziszcze mine and Legnica smelter conversion, unlocking faster permitting, streamlined administration and access to preferential financing. Retków‑Grodziszcze is planned to deliver over 100 million tonnes of ore by 2055, yielding about 1.5 million tonnes of copper and 5,000 tonnes of silver, while Legnica’s recycling line targets 135,000 tonnes of electrolytic copper and 250 tonnes of nickel per year. The move materially boosts EU copper and nickel recycling capacity, central to the CRMA’s 25% recycling target.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental