Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Macmahon at Mt Marion: underground shift and design notes for lithium mine teams

    July 15, 2026|

    Reviewed by Tom Sullivan

    Macmahon at Mt Marion: underground shift and design notes for lithium mine teams

    First reported on International Mining – News

    30 Second Briefing

    Macmahon Underground Pty Ltd has secured an underground mining services contract at the Mt Marion lithium operation, 70 km south of Kalgoorlie, jointly owned by Mineral Resources and Jiangxi Ganfeng Lithium on a 50:50 basis. The scope covers underground development and production work, signalling a shift from Mt Marion’s historically open-pit focus towards a deeper, longer-life operation. Geotechnical and mine planning teams should expect new requirements around underground ground control, ventilation, and ore handling design for hard-rock lithium orebodies in the Eastern Goldfields setting.

    Technical Brief

    • Contract executed by Macmahon Underground Pty Ltd, a wholly owned Macmahon Holdings subsidiary, for Mt Marion.
    • Scope explicitly defined as “underground mining services”, covering both development and production activities.
    • Ownership split remains 50:50 between Mineral Resources Ltd and Jiangxi Ganfeng Lithium Co. Ltd.

    Our Take

    The recent A$490 million brownfield expansion FID at the Mt Marion lithium operation by Mineral Resources and Jiangxi Ganfeng Lithium signals that Macmahon’s underground scope is likely tied to a long-life, higher-throughput phase rather than a short-term development package.

    With Mineral Resources and Ganfeng each holding 50% of Mt Marion, contractor performance by Macmahon Underground at this Western Australia asset will be visible to both an Australian multi-commodity operator and a major Chinese lithium chemicals player, which can influence future underground tendering opportunities in our database.

    Macmahon Underground’s selection here follows its preferred contractor status at the Groundrush decline for the Central Tanami gold project, suggesting the company is building a track record in complex underground development that spans both gold and lithium projects in remote Australian regions.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Geopolitical risk and private capital flows: gold price signals for mine planners
    Mining
    about 2 hours ago

    Geopolitical risk and private capital flows: gold price signals for mine planners

    Growing geopolitical tensions are pushing capital out of sovereign bonds and into private assets, a rotation market-cycle analyst Martin Armstrong links to a potential renewed gold rally from Q1 next year. Armstrong sees Europe as particularly exposed, arguing EU states face rising war-related borrowing costs and inflation as “war drums” lift long-term rates, while bond markets “give us the real story”. He warns that if gold closes below $4,000/oz weekly it could test $3,500–$3,700, but expects elections in the US, Israel and Ukraine to keep geopolitical risk elevated and ultimately drive prices higher.

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners
    Mining
    2 days ago

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams
    Mining
    2 days ago

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams

    South America’s Lithium Triangle holds about 64 million tonnes of identified lithium resources (43% of the global 150 million tonnes), yet geologist José Cabello’s review of 43 salt flats across Argentina, Bolivia and Chile shows that variable brine chemistry, impurities and groundwater behaviour make recovery and costs highly site-specific. Salar de Atacama benefits from ultra‑dry climate, relatively clean brines and strong logistics, while other basins such as Altoandinos, Pedernales, Hombre Muerto Oeste, Rincón, Sal de los Ángeles and Sal de Vida face tighter water and hydrogeological constraints. Direct lithium extraction (DLE) could unlock lower‑grade or impurity‑rich brines, but Cabello stresses that trade‑offs between brine withdrawal and freshwater consumption mean technology selection must be tailored to each basin’s hydrology and ecosystem.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental