Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Research

    Mackay critical minerals partnership: field trial opportunities for mine engineers

    July 21, 2026|

    Reviewed by Tom Sullivan

    Mackay critical minerals partnership: field trial opportunities for mine engineers

    First reported on Australian Mining

    30 Second Briefing

    A new strategic partnership between the Resources Centre of Excellence (RCOE), The University of Queensland and Mining3, launched at the Queensland Mining & Engineering Exhibition in Mackay, will focus on accelerating commercialisation of critical minerals technologies. The collaboration is designed to link laboratory-scale research with field deployment, using RCOE’s Mackay facilities as a testbed for mining equipment, processing flowsheets and digital tools. For engineers, this signals more opportunities to trial critical-mineral extraction and processing innovations in operating Queensland coal and metalliferous mines.

    Technical Brief

    • Scope is limited to technologies with clear commercialisation pathways and industry partners willing to host trials.

    Our Take

    Within our 115 critical-minerals pieces, most activity clusters around Western Australian and Northern Territory hubs, so Mackay’s positioning in Queensland signals an effort to diversify Australia’s innovation centres beyond the usual battery-metals corridors.

    The Resources Centre of Excellence’s work with research-focused groups such as UQ and Mining3 aligns with a pattern in our database where critical-minerals R&D is increasingly anchored in collaborative precincts rather than single-company labs, which tends to accelerate pilot-to-field deployment for new extraction and processing methods.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Trump’s Venezuela gold push: due‑diligence bottlenecks explained for mine teams
    Mining
    about 12 hours ago

    Trump’s Venezuela gold push: due‑diligence bottlenecks explained for mine teams

    Hundreds of millions of dollars’ worth of Venezuelan gold flown into the US under a Trafigura–Minerven deal backed by President Trump and Interior Secretary Doug Burgum is sitting idle because refiners refuse to process it without proof it meets responsible-sourcing standards. The gold, including about $100 million shipped within hours of the March signing, comes from guarded Minerven underground mines where small-scale producers reportedly pay protection money to the Tren de Guayana gang. Similar deals by Heeney Capital and Mercuria, targeting up to $2.2 billion a year in Venezuelan mineral exports, face the same due‑diligence bottleneck.

    Mining Forum: Friedland’s I-ROX comminution push – energy and recovery lens for engineers
    Mining
    about 12 hours ago

    Mining Forum: Friedland’s I-ROX comminution push – energy and recovery lens for engineers

    Robert Friedland is pushing to replace conventional SAG and ball mills with I-Pulse’s I-ROX pulsed-power comminution, which stores electricity then releases nanosecond–microsecond bursts to fracture ore internally along mineral boundaries, with projected energy cuts of up to 80% and about 5% higher metal recoveries. A 2,500 m² I-ROX research centre in Toulouse is testing Kamoa-Kakula copper ore and tailings, while I-Pulse has also secured a US$250 million CHIPS Act award for silicon-carbide semiconductors. The same platform underlies G-Pulse drilling, claimed to triple penetration rates and extend bit life sixfold, to be trialled on the Millungera Basin geothermal project in Queensland.

    Lake Resources’ Kachi lithium project: DIA approval and FEED lens for engineers
    Mining
    about 12 hours ago

    Lake Resources’ Kachi lithium project: DIA approval and FEED lens for engineers

    Lake Resources has secured the key Environmental Impact Declaration for its Kachi lithium brine project in Catamarca, Argentina, clearing the project to enter front-end engineering design for a 25,000 tpa lithium carbonate equivalent facility using Lilac Solutions’ direct lithium extraction process and prior engineering work with Hatch. The DIA confirms compliance with provincial environmental and social standards, imposes a 200 m surficial exclusion zone around the lagoon shoreline, and sets pre‑operations obligations. Lake has also committed $1 million to Catamarca’s Mining Royalty Trust Fund, to be paid between October 2026 and June 2027 for local infrastructure.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental