Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Lake Resources’ Kachi lithium project: DIA approval and FEED lens for engineers

    September 30, 2026|

    Reviewed by Tom Sullivan

    Lake Resources’ Kachi lithium project: DIA approval and FEED lens for engineers

    First reported on MINING.com

    30 Second Briefing

    Lake Resources has secured the key Environmental Impact Declaration for its Kachi lithium brine project in Catamarca, Argentina, clearing the project to enter front-end engineering design for a 25,000 tpa lithium carbonate equivalent facility using Lilac Solutions’ direct lithium extraction process and prior engineering work with Hatch. The DIA confirms compliance with provincial environmental and social standards, imposes a 200 m surficial exclusion zone around the lagoon shoreline, and sets pre‑operations obligations. Lake has also committed $1 million to Catamarca’s Mining Royalty Trust Fund, to be paid between October 2026 and June 2027 for local infrastructure.

    Technical Brief

    • DIA issuance followed completion of statutory public consultation and multi‑agency technical evaluations in Catamarca.
    • Permit scope explicitly covers engineering design, resource management plan and defined “sustainability profile” for Kachi.
    • Lake will now refine FEED deliverables with Hatch and Lilac, including process design and plant configuration.
    • FEED tasks include supplier selection, long‑lead equipment definition, construction logistics planning and operational risk mitigation.
    • Detailed FEED outputs will underpin data rooms for export credit agencies, off‑takers and equity partners.
    • Kachi is described as one of few large‑scale, independent greenfield lithium brine projects globally at this stage.
    • Market reaction: Lake Resources’ share price rose 10.53% to A$0.04, implying A$107.7 million valuation.

    Our Take

    The defined 200 m surficial exclusion zone and the earmarked US$1 million contribution to Catamarca’s Mining Royalty Trust Fund signal that provincial authorities are formalising environmental and community-offset structures that other Lithium Triangle brine projects will likely be benchmarked against in future permitting rounds.

    With lithium and copper both prominent in our 353 keyword-matched pieces, the mention of Centinela copper mine alongside Kachi underlines how Latin American portfolios are increasingly being framed around dual exposure to battery metals, which can help companies like Lake Resources position themselves to investors as part of a broader energy-transition metals play rather than a single-commodity bet.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Trump’s Venezuela gold push: due‑diligence bottlenecks explained for mine teams
    Mining
    about 3 hours ago

    Trump’s Venezuela gold push: due‑diligence bottlenecks explained for mine teams

    Hundreds of millions of dollars’ worth of Venezuelan gold flown into the US under a Trafigura–Minerven deal backed by President Trump and Interior Secretary Doug Burgum is sitting idle because refiners refuse to process it without proof it meets responsible-sourcing standards. The gold, including about $100 million shipped within hours of the March signing, comes from guarded Minerven underground mines where small-scale producers reportedly pay protection money to the Tren de Guayana gang. Similar deals by Heeney Capital and Mercuria, targeting up to $2.2 billion a year in Venezuelan mineral exports, face the same due‑diligence bottleneck.

    Mining Forum: Friedland’s I-ROX comminution push – energy and recovery lens for engineers
    Mining
    about 3 hours ago

    Mining Forum: Friedland’s I-ROX comminution push – energy and recovery lens for engineers

    Robert Friedland is pushing to replace conventional SAG and ball mills with I-Pulse’s I-ROX pulsed-power comminution, which stores electricity then releases nanosecond–microsecond bursts to fracture ore internally along mineral boundaries, with projected energy cuts of up to 80% and about 5% higher metal recoveries. A 2,500 m² I-ROX research centre in Toulouse is testing Kamoa-Kakula copper ore and tailings, while I-Pulse has also secured a US$250 million CHIPS Act award for silicon-carbide semiconductors. The same platform underlies G-Pulse drilling, claimed to triple penetration rates and extend bit life sixfold, to be trialled on the Millungera Basin geothermal project in Queensland.

    Mining
    about 2 hours ago

    Sumitomo’s Dos Amigos copper strategy in Chile: design and risk notes for engineers

    Sumitomo Corporation of Americas is using its Dos Amigos copper project in Chile to illustrate a strategy of entering early-stage assets alongside local partners rather than waiting for fully derisked operations. The company’s VISIONS September 2026 edition describes a focus on long-life sulphide resources and shared development of mine, concentrator and associated infrastructure with Chilean operators, instead of purely financial offtake deals. For engineers, this signals continued appetite for greenfield copper projects in Chile requiring joint design of pits, tailings storage and processing plants with Japanese technical input.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental