Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Lion Copper’s Yerington copper portfolio: scale, capex and PFS lens for mine planners

    August 5, 2026|

    Reviewed by Joe Ashwell

    Lion Copper’s Yerington copper portfolio: scale, capex and PFS lens for mine planners

    First reported on MINING.com

    30 Second Briefing

    Lion Copper & Gold’s Bear deposit at the Rio Tinto-backed Yerington project in Nevada has an initial resource of about 1.0 billion indicated tonnes at 0.29% copper (6.7 billion lb) and 1.7 billion inferred tonnes at 0.22% copper (8.7 billion lb), making it one of the state’s largest undeveloped copper resources. Combined with Yerington’s 506.6 million tons of proven and probable reserves at 0.21% copper (2.1 billion lb), Lion’s Nevada portfolio now totals roughly 19 billion lb of contained copper, surpassing Hudbay’s Mason and Pumpkin Hollow. A 2025 PFS outlined 120 million lb/year cathode output over 12 years, with a post-tax NPV7 of US$694 million, 14.6% IRR and US$724 million initial capex, while Rio Tinto’s Nuton continues heap-leach testing under its 65% earn-in option.

    Technical Brief

    • Bear deposit lies within the Rio Tinto-backed Yerington district, ~34 km west of Carson City.
    • Resource upgrade at Bear is explicitly intended to support further engineering studies and mine planning.
    • Lion Copper flags additional drilling at Bear as the key lever to convert and expand inferred tonnage.
    • Yerington’s proven and probable reserve figure explicitly includes the MacArthur deposit within the same project area.
    • Both Bear and Yerington fall under Rio Tinto/Nuton’s option-to-earn 65% interest via a new project company.
    • Nuton’s proprietary heap-leach technology has been under test at Yerington since 2022, targeting sulphide leachability.
    • The same Nuton leach flowsheet is already in commercial use at Gunnison Copper’s Johnson Camp mine in Arizona.
    • Market reaction to the Bear resource update saw Lion Copper’s share price drop 24% to C$0.22, capitalising it at C$94.9 million.

    Our Take

    Rio Tinto’s Nuton has already demonstrated commercial-scale sulphide bioleaching at Gunnison Copper’s Johnson Camp mine in Arizona, and the AWS offtake deal there signals that copper cathode from Yerington using the same technology could be positioned for premium, low-carbon supply contracts rather than just selling into the spot market.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners
    Mining
    1 day ago

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams
    Mining
    1 day ago

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams

    South America’s Lithium Triangle holds about 64 million tonnes of identified lithium resources (43% of the global 150 million tonnes), yet geologist José Cabello’s review of 43 salt flats across Argentina, Bolivia and Chile shows that variable brine chemistry, impurities and groundwater behaviour make recovery and costs highly site-specific. Salar de Atacama benefits from ultra‑dry climate, relatively clean brines and strong logistics, while other basins such as Altoandinos, Pedernales, Hombre Muerto Oeste, Rincón, Sal de los Ángeles and Sal de Vida face tighter water and hydrogeological constraints. Direct lithium extraction (DLE) could unlock lower‑grade or impurity‑rich brines, but Cabello stresses that trade‑offs between brine withdrawal and freshwater consumption mean technology selection must be tailored to each basin’s hydrology and ecosystem.

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners
    Mining
    1 day ago

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners

    EU regulators have granted strategic status under the Critical Raw Materials Act to KGHM’s 9.5‑billion‑zloty ($2.44bn) Retków‑Grodziszcze mine and Legnica smelter conversion, unlocking faster permitting, streamlined administration and access to preferential financing. Retków‑Grodziszcze is planned to deliver over 100 million tonnes of ore by 2055, yielding about 1.5 million tonnes of copper and 5,000 tonnes of silver, while Legnica’s recycling line targets 135,000 tonnes of electrolytic copper and 250 tonnes of nickel per year. The move materially boosts EU copper and nickel recycling capacity, central to the CRMA’s 25% recycling target.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental