Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product
    Sustainability

    Jianlong–CATL electrification deal: mine haulage and plant power notes for engineers

    April 28, 2026|

    Reviewed by Joe Ashwell

    Jianlong–CATL electrification deal: mine haulage and plant power notes for engineers

    First reported on International Mining – News

    30 Second Briefing

    Jianlong Group and battery giant CATL have signed a strategic cooperation agreement in Ningde, Fujian, to electrify key stages of the steel industry value chain, including green smart mines and on-site logistics. The partnership covers deployment of new energy systems in steel production, mine haulage and plant logistics electrification, and development of zero‑carbon industrial parks. For mine operators and plant engineers, this signals increased demand for battery‑powered mobile equipment, high‑capacity charging infrastructure, and integrated energy‑storage solutions across Chinese steel and mining assets.

    Technical Brief

    • Cooperation scope explicitly includes “green smart mines”, pointing to data-integrated fleets, dispatch and energy‑management platforms.
    • Supply chain coordination between CATL and Jianlong is intended to stabilise battery availability and lifecycle service support.

    Our Take

    CATL’s April 10 agreement with Jianlong follows its MoU with Rio Tinto on mine electrification and a 500‑truck deployment with Inner Mongolia Guangna Coal, signalling that CATL is building a full mining‑to‑processing reference stack for heavy industry clients rather than selling batteries on a project‑by‑project basis.

    The China‑centred work with Jianlong, Rio Tinto and Guangna Coal gives CATL a strong testing ground for large‑format LFP and related systems in harsh mining environments, experience that Australian operators referenced in this piece can leverage when de‑risking their own fleet and plant electrification programmes.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 9 hours ago

    Weir’s WARMAN MCR² mill circuit pump: reliability and wear-control notes for plant engineers

    Weir has introduced the WARMAN MCR² mill circuit pump as an evolution of its existing WARMAN mill circuit range, targeting mineral processing plants facing more complex ores, higher throughput and harsher slurry conditions. The MCR² is engineered to give operators tighter control over wear behaviour, maintenance intervals and overall asset condition in high-duty grinding circuits. For plant engineers, the new design signals further options to stabilise mill discharge pumping performance as ore hardness and variability increase.

    Tivan’s Walshy’s Wall drilling: subsurface targets and RC plan for mine planners
    Mining
    about 10 hours ago

    Tivan’s Walshy’s Wall drilling: subsurface targets and RC plan for mine planners

    Tivan has secured final regulatory and heritage approvals to start maiden drilling at the Walshy’s Wall target within the Sandover Fluorite Project in the Northern Territory, with a staged programme of 31 reverse circulation holes scheduled from October. Walshy’s Wall, a manganese–barite gossan discovered by Tivan geologists in October 2025, will be tested for subsurface continuity and grade using RC to penetrate the weathered profile efficiently. Early results will guide follow-up step-out drilling and resource definition across the broader fluorite–manganese system.

    Bellevue Gold board refresh: governance and project finance lens for mine teams
    Mining
    about 10 hours ago

    Bellevue Gold board refresh: governance and project finance lens for mine teams

    Bellevue Gold is adding two independent non-executive directors, Debra Counsell and Tanya Rybarczyk, to its board from 23 September 2026 as part of a planned succession process for the Western Australian gold producer. Both bring more than 30 years’ experience spanning mining, resources, finance and infrastructure, signalling a stronger governance and capital markets focus as Bellevue ramps up its namesake underground operation. The appointments point to closer board scrutiny of project financing, risk management and long-term growth options in a volatile gold price environment.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental