Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product
    Sustainability

    Hertha Metals magnet-grade iron: FLEXHERS process and 2027 deadline for engineers

    August 19, 2026|

    Reviewed by Tom Sullivan

    Hertha Metals magnet-grade iron: FLEXHERS process and 2027 deadline for engineers

    First reported on MINING.com

    30 Second Briefing

    Hertha Metals has produced 99.95% purity (3N5) magnet-grade iron at its demonstration-scale FLEXHERS (flexible fuel hydrogen electric reduction smelting) plant in Conroe, Texas, using fully domestic iron ore and natural gas. The Houston startup says it is the first US producer to meet top rare earth magnet makers’ iron specifications with entirely domestic inputs, addressing a material that currently is almost wholly imported. With US defence manufacturers facing a 1 January 2027 deadline to cut Chinese-origin magnet content, Hertha plans its next Chalyx facility to supply high-purity iron for NdFeB magnet producers.

    Technical Brief

    • Demonstration-scale facility is located at Conroe, Texas, operated by Houston-based startup Hertha Metals.
    • High-purity iron feed makes up roughly 70% by weight of NdFeB magnets in EVs and turbines.
    • Current US consumption of magnet-grade iron is “almost entirely” met by imports, according to Hertha.
    • CEO Laureen Meroueh frames high‑purity iron as a “least visible” but critical defence and EV material.

    Our Take

    Hertha Metals’ 3N5 iron purity aligns with its earlier plan to supply 10,000 t/y of high‑purity iron from Conroe, Texas, which in our database is one of the few US‑based magnet feed projects explicitly tied to Department of Defense supply‑chain objectives.

    With defence manufacturers facing a January 2027 deadline to cut Chinese‑origin magnet content, the 70% iron weight fraction in neodymium‑iron‑boron magnets means any scalable US iron nitride or magnet‑grade iron output could become a bottleneck or price lever, even if rare earth separation capacity expands on schedule.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Hertha Metals’ $133m Texas iron plant: process and cost lens for engineers
    Materials
    4 days ago

    Hertha Metals’ $133m Texas iron plant: process and cost lens for engineers

    Texas startup Hertha Metals has raised $133.65 million in Series A funding, including $65 million from the US government’s IBAS programme, to build its Hertha Chalyx plant targeting 10,000 tonnes per year of steel-grade and magnet-grade high-purity iron. The facility will deploy the FLEXHERS process—a single continuous hydrogen/natural-gas reduction reactor coupled with electric arc furnace technology—claiming 25% lower production costs than blast furnaces and emissions cuts of 50% (natural gas) to up to 98% (hydrogen). Chalyx, alongside the existing 360 t/y Pi100 pilot in Conroe, aims to create a fully domestic feedstock source for NdFeB magnet and defence manufacturers.

    WRS Texas solar panel recovery plant: process design and value notes for engineers
    Materials
    4 days ago

    WRS Texas solar panel recovery plant: process design and value notes for engineers

    We Recycle Solar will build the US’ first end-to-end critical materials recovery facility for retired solar panels on a 10-acre campus outside Dallas, targeting Q3 2027 start-up. The Arizona-based firm says the commercial-scale plant will process one panel per minute and recover up to 96% of contained silver, copper, silicon, aluminium and glass through a proprietary extraction process that avoids any offshore smelting. WRS plans a further $100 million investment in four additional US facilities within four years, aiming to capture value from an $80 billion projected 2050 solar-panel waste stream.

    Aston University–Jesmonite cement alternatives: material insights for façade engineers
    Materials
    5 days ago

    Aston University–Jesmonite cement alternatives: material insights for façade engineers

    Aston University is partnering with Jesmonite Ltd under an Innovate UK knowledge transfer partnership to redevelop Jesmonite’s low‑carbon acrylic, resin-based composites with added biochar as potential cement alternatives for façades and surface applications. Researchers from Aston’s Energy and Bioproducts Research Institute and Department of Civil Engineering will characterise the materials at molecular level and test mechanical and durability performance while targeting further reductions in embodied carbon. The work aims to move Jesmonite’s currently niche, film-set and design products into mainstream construction specifications, offering designers non‑cementitious façade and cladding options.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental