Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product
    Sustainability

    Hertha Metals’ $133m Texas iron plant: process and cost lens for engineers

    September 30, 2026|

    Reviewed by Joe Ashwell

    Hertha Metals’ $133m Texas iron plant: process and cost lens for engineers

    First reported on MINING.com

    30 Second Briefing

    Texas startup Hertha Metals has raised $133.65 million in Series A funding, including $65 million from the US government’s IBAS programme, to build its Hertha Chalyx plant targeting 10,000 tonnes per year of steel-grade and magnet-grade high-purity iron. The facility will deploy the FLEXHERS process—a single continuous hydrogen/natural-gas reduction reactor coupled with electric arc furnace technology—claiming 25% lower production costs than blast furnaces and emissions cuts of 50% (natural gas) to up to 98% (hydrogen). Chalyx, alongside the existing 360 t/y Pi100 pilot in Conroe, aims to create a fully domestic feedstock source for NdFeB magnet and defence manufacturers.

    Technical Brief

    • FLEXHERS uses a single continuous reduction reactor, replacing the traditional multi-step, coal-based blast furnace route.
    • The reactor is designed to accept any grade of iron ore as feed, increasing ore sourcing flexibility.
    • Electric arc furnace integration enables direct production of both steel and high-purity iron on the same site.
    • Pi100 is already in active supplier qualification with major US rare-earth magnet manufacturers.
    • NdFeB permanent magnets comprise roughly 70% high-purity iron by weight, driving tight impurity control requirements.
    • IBAS’s $65M equity stake links the project explicitly to US defence industrial base resilience objectives.

    Our Take

    The related June 2026 piece on Hertha Metals’ 10,000 t/y Conroe plant indicates this Series A raise is backing a scale-up path from the current 360 t/y demonstration facility toward commercial volumes specifically targeted at NdFeB magnet supply chains in the US.

    With FLEXHERS claiming up to 98% emissions reduction when using hydrogen, Hertha’s magnet-grade iron positions Texas within the small subset of our Materials coverage where decarbonised iron and steel processes are being tied directly to rare earth and EV supply security rather than generic green steel markets.

    The involvement of US Government-linked entities such as IBAS and DFARS-related defence framing, alongside investors like Toyota Ventures and Siemens Financial Services, signals that Hertha’s magnet-grade iron is being treated as dual-use infrastructure for both defence and automotive OEMs seeking non-Chinese NdFeB magnet inputs.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Cement industry’s call for UK support: net-zero 2050 implications for engineers
    Materials
    2 days ago

    Cement industry’s call for UK support: net-zero 2050 implications for engineers

    Cement and concrete producers are urging the UK government to accelerate support for emissions-cutting technologies after a new sector report tracked progress towards a 2050 net-zero target. Industry bodies are pushing for capital support and market mechanisms to scale up carbon capture and storage on kilns, switch to low-clinker cements, and expand use of alternative fuels in existing plants. For civil engineers and contractors, the shift implies earlier adoption of lower-CO₂ concretes and closer engagement with evolving cement specifications and supply-chain constraints.

    EverMetal–Advanced Alloys deal: supply-chain and sourcing notes for engineers
    Materials
    4 days ago

    EverMetal–Advanced Alloys deal: supply-chain and sourcing notes for engineers

    EverMetal Holdings has acquired Sheffield-based Advanced Alloys, adding UK processing of complex nickel, cobalt and minor metal superalloy turnings and trade in high-purity tungsten, tantalum and niobium to its existing US recycler CAI Custom Alloys. The deal links one of the world’s largest superalloy scrap and revert hubs with the largest end-market for superalloys, creating a transatlantic sourcing and processing network for aerospace, power generation, medical and space OEMs. Backed by GEF Capital Partners, EverMetal plans further acquisitions of founder- and family-owned superalloy revert, turnings preparation and toll-processing businesses across North America and Europe.

    Holcim UK people director appointment: skills pipeline insights for site engineers
    Materials
    5 days ago

    Holcim UK people director appointment: skills pipeline insights for site engineers

    Holcim UK has appointed long-serving HR leader Hazel Mooney as people director, tasking her with attracting, developing and retaining talent across its cement, aggregates, ready-mix and construction materials operations. Mooney joined Holcim in 2013 and has progressed through several senior roles, including head of people, before serving as interim people director. CEO Adham El Sharkawy points to her deep knowledge of the UK business and workforce as critical for sustaining skills pipelines in a tightening labour and site-based engineering talent market.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental