Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Gold price extends weekly rise: project economics lens for mine planners

    April 2, 2026|

    Reviewed by Joe Ashwell

    Gold price extends weekly rise: project economics lens for mine planners

    First reported on MINING.com

    30 Second Briefing

    Gold prices extended their rally on Wednesday, with spot gold up 1.8% to about $4,760/oz and US futures approaching $4,800/oz, taking gains to 4.5% over four sessions after President Trump announced a pause in missile strikes against Iran. De‑escalation signals, including Trump’s claim that US forces could leave the region “within two weeks, maybe three”, eased inflation fears, pushed the US dollar lower and revived expectations that the Federal Reserve has “limited bandwidth” to raise rates. JPMorgan, Goldman Sachs, Wells Fargo and BNP Paribas all maintain bullish targets between $5,400 and above $6,000/oz, with some strategists seeing $5,000/oz as plausible on renewed rate‑cut bets.

    Technical Brief

    • Spot bullion touched about $4,760/oz intraday on Wednesday, extending a move that began last week.
    • US gold futures pushed towards the $4,800/oz level, tracking the spot market’s safe‑haven bid.
    • Trump’s stated withdrawal timeline of “within two weeks, maybe three” from the Middle East reduced perceived geopolitical risk.
    • Closure of the Strait of Hormuz, carrying roughly 20% of global oil supply, had previously driven inflation concerns.
    • Jerome Powell reiterated that longer‑term US inflation expectations remain “anchored”, tempering aggressive rate‑hike assumptions.
    • JPMorgan’s Yuxuan Tang links gold’s support to growth‑risk narratives and Fed “limited bandwidth” for further hikes.
    • Wells Fargo now targets $6,300/oz, while Goldman Sachs maintains a $5,400/oz year‑end forecast.
    • BNP Paribas’ David Wilson expects any formal peace deal to trigger a sharp, headline‑driven gold price spike.

    Our Take

    Goldman Sachs and Bloomberg, which feature in both this article and the 24 December 2025 record-gold coverage, have consistently framed gold’s 2025–26 price action as part of a broader safe-haven and central-bank-buying cycle, suggesting traders may interpret Trump’s 2–3 week war-exit guidance more as a volatility event than a change in the longer-term bull thesis.

    With around a fifth of global oil supply moving through the Strait of Hormuz, any perceived reduction in conflict risk there not only eases immediate upside pressure on oil but also tends to shift mining equity models in our coverage from stress-testing high energy-cost scenarios back towards base cases for power and fuel inputs, particularly for energy-intensive metals like steel and aluminium.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Buffalo Potash permit at Disley: design, risk and process notes for mine engineers
    Mining
    about 4 hours ago

    Buffalo Potash permit at Disley: design, risk and process notes for mine engineers

    Buffalo Potash has secured Saskatchewan approval to complete construction and operate its Disley initial production module, a 125,000 t/y soluble-grade potash facility 50 km northwest of Regina using a patented horizontal line-drive brine circulation method through parallel horizontal wells. The C$41.5 million module will test selective underground dissolution of potassium chloride with sodium-chloride-saturated brine and supply local agriculture, drilling-fluid markets and potassium-chloride brine for regional oilfields, ahead of planned 500,000 t/y Disley East and West expansions to about 1.13 Mt/y. The permit, which runs to 30 April and excludes future modules, requires groundwater characterisation, air-quality compliance and financial assurance, while the project proceeds without a feasibility study or declared reserves, elevating technical and economic risk.

    Exiro-led takeover of Vale’s Manitoba nickel complex: key points for mine planners
    Mining
    about 4 hours ago

    Exiro-led takeover of Vale’s Manitoba nickel complex: key points for mine planners

    Exiro Minerals, Orion Resource Partners and Canada Growth Fund have acquired an 81.1% stake in Vale’s Thompson nickel operations in northern Manitoba, committing up to US$200 million to sustain and develop the six-decade-old complex. The new vehicle, Exiro Nickel, takes over day-to-day control of two operating underground mines, the adjacent concentrator and exploration ground along the 135 km Thompson Nickel Belt, while Vale Base Metals retains an 18.9% interest. A multi-year offtake agreement keeps Vale buying nickel concentrate from the Thompson mill, providing a defined outlet for future production.

    Mining
    about 4 hours ago

    Moeve–Emerita 100% renewable diesel deal in Spain: decarbonisation notes for mines

    Moeve and Emerita Resources have signed Spain’s first mining-sector agreement to deploy 100% renewable diesel (HVO) at industrial scale, designating Moeve as preferred supplier of this second-generation biofuel. The HVO, derived from waste and residue feedstocks rather than food crops, is claimed to cut lifecycle CO2 emissions by up to 90% compared with conventional diesel. For mine operators, the drop-in fuel compatibility with existing diesel engines offers a near-term route to decarbonise haul trucks and auxiliary fleets without major equipment changes.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental