Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability

    Glencore’s Newlands rehabilitation: bulk earthworks and cover design notes for engineers

    August 4, 2026|

    Reviewed by Tom Sullivan

    Glencore’s Newlands rehabilitation: bulk earthworks and cover design notes for engineers

    First reported on Australian Mining

    30 Second Briefing

    Glencore is advancing large-scale rehabilitation at the Newlands coal complex in Queensland, 150km west of Mackay, following closure after producing about 229 million tonnes of thermal and metallurgical coal since 1983. Works include reshaping and capping open-cut voids, recontouring spoil dumps, and establishing long-term drainage and erosion controls to stabilise the post-mining landform. For geotechnical and civil contractors, the project signals multi-year demand for bulk earthworks, cover system design, and performance monitoring on one of Australia’s largest coal site closures.

    Technical Brief

    • Landform design is constrained by regional catchment hydrology and downstream water quality protection requirements.
    • Long-term monitoring obligations include surface stability, erosion performance and vegetation establishment over rehabilitated areas.

    Our Take

    Glencore features across several recent items in our database for copper, recycling and waste‑to‑value ventures, so a large‑scale coal rehabilitation effort at Newlands in Queensland signals the group is keen to show environmental performance not just in future‑facing metals but also in legacy thermal assets.

    Australian Mining also appears in coverage of Austral Resources’ copper operations with Glencore, suggesting that Newlands rehabilitation will likely be benchmarked in the same trade press against how Glencore manages life‑of‑mine responsibilities at its base‑metal assets in Australia.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    41 minutes ago

    Integrated Pump Technology’s Grindex, Godwin push: dewatering notes for mine engineers

    Integrated Pump Technology is using Grindex submersible pumps and Godwin diesel-driven units to expand mine dewatering supply across both mature and emerging African jurisdictions. The company is banking on the brands’ large installed base on the continent and strong after-sales support to win contracts where pump reliability and serviceability are critical selection criteria. For mine operators, the move signals wider access to established high-head and high-abrasion dewatering solutions without changing existing spares, maintenance practices or pump curves.

    Mining
    41 minutes ago

    Epiroc expands aftermarket in South Africa: reliability and lead-time gains for mines

    Epiroc AB has acquired the business of Eventspec Proprietary Limited, a Johannesburg-based mining aftermarket specialist manufacturing parts for drill rigs, mine trucks and loaders. Eventspec, with more than 20 years’ experience, also delivers component rebuilds, structural repairs and full machine service packages for underground and surface fleets. The deal expands Epiroc’s in-country capability for non-OEM and OEM-equivalent parts and workshop support, reducing lead times and import dependence for South African and regional mines.

    Mining
    41 minutes ago

    Northern Katpar tungsten DFS: design and permitting insights for mine engineers

    Cove Kaz Capital Group has appointed DRA Global, ERM and Knight Piésold to deliver a definitive feasibility study for the Northern Katpar tungsten project in Kazakhstan, held by Severniy Katpar LLP in which Cove Kaz holds an interest. DRA Global will lead process plant and mine design, ERM will focus on environmental and social impact assessment, and Knight Piésold will cover tailings, water management and geotechnical engineering. The DFS mandate signals movement towards detailed design of tungsten concentrator flowsheets, TSF layouts and permitting packages in a critical minerals jurisdiction.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy