Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Gediktepe mine heap leach upgrade: ACG gold recovery gains and capex deferral for engineers

    July 2, 2026|

    Reviewed by Tom Sullivan

    First reported on International Mining – News

    30 Second Briefing

    ACG Metals has reported sustained improvement in gold recovery at the Gediktepe mine in Türkiye after introducing a proprietary heap leaching process, already patented locally and in progress across 35 other jurisdictions. The new metallurgical approach is applied as an additional product within the existing recovery circuit rather than a full plant redesign, targeting higher extraction from oxide ore heaps. For engineers, the key point is a process-intensification route to lift recoveries on current pads, potentially deferring major capital for new leach infrastructure.

    Technical Brief

    • Patent coverage already secured in Türkiye, with parallel filings underway in 35 other jurisdictions.

    Our Take

    ACG Metals’ move to patent its Gediktepe gold heap leach process in 35 countries aligns with its stated plan (16 March 2026 item) to buy up to 10 producing or near-producing copper assets along the Tethyan Belt, signalling it wants a proprietary processing edge it can roll out across a regional portfolio rather than a single Turkish mine.

    Given Gediktepe was acquired in a US$300 million deal (16 March 2026 coverage), even modest uplift in gold recovery from a proprietary heap leach route could materially improve payback and free cash flow, strengthening ACG’s balance sheet for the copper and multi-metal acquisitions it is targeting.

    Gold is one of the most frequently covered commodities in our mining database, and ACG Metals now appears in several of those pieces, suggesting the company is emerging as a recurring mid-tier player whose technology choices at Gediktepe will be closely watched by other operators in Türkiye and along the wider Tethyan trend.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 3 hours ago

    LGMG & Boonray RTE156 truck: OEM autonomous electric haulage lens for mine planners

    LGMG is partnering with autonomous driving specialist Boonray to develop the RTE156, a factory‑fitted autonomous, battery electric mining truck aimed at the Chinese surface mining market. The collaboration integrates Boonray’s AHS stack directly into LGMG’s haul truck platform, avoiding aftermarket retrofits and allowing tighter control of drive‑by‑wire, perception and fleet management systems. For mine operators, the model signals growing availability of OEM‑level autonomous electric haulage options that can be specified at purchase and tuned to local duty cycles and ramp profiles.

    South American copper mine downtime cuts: Lubrication Engineers case insights for reliability
    Mining
    about 3 hours ago

    South American copper mine downtime cuts: Lubrication Engineers case insights for reliability

    A large South American copper mine has increased crusher availability to production by 2.2% after switching the bushing gear oil to a formulation supplied by Lubrication Engineers. The change also cut lubricant consumption by 83%, delivering direct cost savings alongside reduced handling and storage requirements. For reliability engineers, the case underlines the impact of lubricant selection on crusher uptime without major mechanical modifications.

    Mining
    about 3 hours ago

    Sierra Gorda 25% capacity uplift: process and tailings implications for engineers

    Sierra Gorda, the Chilean open-pit copper mine in which South32 holds a 45% interest, has approved construction of a fourth grinding line following a completed feasibility study. The brownfield plant expansion is designed to lift processing capacity by about 25%, debottlenecking the existing concentrator rather than adding new mining fronts. For process and geotechnical teams, the project signals higher mill throughput demands on existing tailings and water circuits, with scope for re-optimising grinding media, liner wear strategies and cyclone classification.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy