Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Gediktepe mine heap leach upgrade: ACG gold recovery gains and capex deferral for engineers

    July 2, 2026|

    Reviewed by Tom Sullivan

    Gediktepe mine heap leach upgrade: ACG gold recovery gains and capex deferral for engineers

    First reported on International Mining – News

    30 Second Briefing

    ACG Metals has reported sustained improvement in gold recovery at the Gediktepe mine in Türkiye after introducing a proprietary heap leaching process, already patented locally and in progress across 35 other jurisdictions. The new metallurgical approach is applied as an additional product within the existing recovery circuit rather than a full plant redesign, targeting higher extraction from oxide ore heaps. For engineers, the key point is a process-intensification route to lift recoveries on current pads, potentially deferring major capital for new leach infrastructure.

    Technical Brief

    • Patent coverage already secured in Türkiye, with parallel filings underway in 35 other jurisdictions.

    Our Take

    ACG Metals’ move to patent its Gediktepe gold heap leach process in 35 countries aligns with its stated plan (16 March 2026 item) to buy up to 10 producing or near-producing copper assets along the Tethyan Belt, signalling it wants a proprietary processing edge it can roll out across a regional portfolio rather than a single Turkish mine.

    Given Gediktepe was acquired in a US$300 million deal (16 March 2026 coverage), even modest uplift in gold recovery from a proprietary heap leach route could materially improve payback and free cash flow, strengthening ACG’s balance sheet for the copper and multi-metal acquisitions it is targeting.

    Gold is one of the most frequently covered commodities in our mining database, and ACG Metals now appears in several of those pieces, suggesting the company is emerging as a recurring mid-tier player whose technology choices at Gediktepe will be closely watched by other operators in Türkiye and along the wider Tethyan trend.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 10 hours ago

    Cementation Africa early dewatering designs: key lessons for mine planners

    Cementation Africa is pushing for underground mine dewatering to be designed from the earliest study phases, with hydrogeological investigations embedded in scoping and pre-feasibility work rather than added after shaft sinking. Study Manager Mine Engineering John Goulding stresses that early characterisation of aquifers, inflow rates and pore pressures allows proper sizing and siting of pump stations, sumps and grout curtains, and integration with shaft and decline layouts. For geotechnical and mine planners, this approach reduces unplanned inflows, avoids costly retrofits and supports more reliable ground support and excavation sequencing.

    Mining
    about 10 hours ago

    JordProxa at Lilac’s Great Salt Lake DLE plant: process design notes for engineers

    JordProxa has been selected as technology and equipment partner for Lilac Solutions’ Phase 1 commercial lithium carbonate plant on Utah’s Great Salt Lake, which targets 5,000 t/y of battery-grade lithium carbonate using direct lithium extraction. The partnership covers the downstream conversion process, integrating JordProxa’s thermal and process equipment with Lilac’s ion-exchange DLE system. First lithium production is planned for 2028, signalling a move from pilot-scale brine processing to a full commercial facility in a chemically complex salt-lake environment.

    Mining
    about 10 hours ago

    Orica Digital Solutions’ Axis Mining support in North Bay: reliability gains for drill teams

    Orica Digital Solutions has opened an Axis Mining Technology Technical Support & Service Centre in North Bay, Ontario, extending on-the-ground backing for its orebody intelligence systems to Canadian and wider North American mines. The facility will support deployment and maintenance of Axis downhole navigation and drillhole survey tools, improving turnaround for calibration, repairs and firmware updates that previously relied on distant service hubs. For geologists and drill and blast teams, closer support should reduce downtime on production and definition drilling and enable more consistent high-precision orebody data.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy