Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability
    Contract Award

    Fortescue–PLS Pilbara PPA: power security and expansion lens for mine planners

    October 28, 2026|

    Reviewed by Tom Sullivan

    Fortescue–PLS Pilbara PPA: power security and expansion lens for mine planners

    First reported on Australian Mining

    30 Second Briefing

    PLS has signed a 20‑year power purchase agreement with Fortescue subsidiary FMG Clean Energy to supply at least 325GWh per year of electricity to the Pilgangoora lithium operation in Western Australia, matching the site’s forecast demand under its P2000 operating model. The deal is described as the first large‑scale renewable PPA between two major Pilbara miners and is expected to draw on Fortescue’s planned solar, wind and battery assets. For mine planners, the long‑tenure, fixed‑volume arrangement materially de‑risks power availability for future plant expansions and electrified fleets.

    Technical Brief

    • PPA tenure of 20 years enables long-horizon mine planning and power integration into life-of-mine studies.
    • Agreement is executed via PLS subsidiary Pilgangoora Operation with Fortescue’s FMG Clean Energy unit.
    • Firm power commitment supports PLS’ P2000 operating model, underpinning higher-throughput processing and associated load growth.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Liebherr excavators at Gruyere: load–haul planning notes for mine engineers
    Mining
    about 2 hours ago

    Liebherr excavators at Gruyere: load–haul planning notes for mine engineers

    Delivery of two Liebherr R 9600s and one R 9400 hydraulic excavator to Gold Fields’ Gruyere gold mine in Western Australia marks the start of a new OEM–operator partnership for large-scale load-and-haul. The ultra-class R 9600, typically paired with 220–290 tonne haul trucks, will materially increase dig capacity on the mine’s main production faces, while the slightly smaller R 9400 offers more flexible deployment on satellite pits and cutbacks. For mine planners and maintenance teams, the mixed Liebherr fleet introduces new loading geometries, bucket–truck match options, and parts/skills requirements.

    PLS Pilgangoora lithium output surge: scheduling and plant notes for engineers
    Mining
    about 2 hours ago

    PLS Pilgangoora lithium output surge: scheduling and plant notes for engineers

    PLS delivered record quarterly spodumene concentrate output of 267,600 tonnes from its Pilgangoora operation in Western Australia, a 25 per cent increase driven by the restart of the Ngungaju processing plant. Additional Ngungaju throughput is complementing higher-grade or more consistent feed from the main Pilgan plant, lifting overall plant utilisation early in the 2026–27 financial year. The step-up in concentrate tonnage will pressure mine scheduling, tailings capacity and haulage logistics, and may justify further debottlenecking of crushing and classification circuits.

    NT mining boom workforce gap: key planning lessons for project teams
    Mining
    about 2 hours ago

    NT mining boom workforce gap: key planning lessons for project teams

    A new Minerals Council of Australia report, Territory Ready: Building Territory capability for the next generation of resource development, maps how the Northern Territory can staff upcoming critical minerals, gas and conventional mining projects by strengthening VET-to-degree pathways and on-the-job training. Recommendations include structured partnerships between NT mines and Charles Darwin University, targeted interstate and international recruitment for specialist roles such as process engineers and geoscientists, and expanded apprenticeships in remote communities. For operators, the message is to lock in workforce pipelines early or risk project delays and higher labour costs.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental