Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Fitzroy’s near-term Chile copper mine: heap-leach concept and PFS lens for engineers

    July 25, 2026|

    Reviewed by Tom Sullivan

    Fitzroy’s near-term Chile copper mine: heap-leach concept and PFS lens for engineers

    First reported on MINING.com

    30 Second Briefing

    Fitzroy Minerals has extended broad, shallow copper mineralisation along the 1.7 km Tenorita trend at its Buen Retiro project in Chile, with hole BRT-DDH072 cutting 111.9 m at 0.97% Cu from 21.1 m depth, including 18 m at 1.59% Cu from 84 m, and BRT-DDH070 returning 147.7 m at 0.41% Cu from 26.3 m. The company has completed 78 diamond holes for 13,036 m since February and plans a further 9,000 m this year to deliver a maiden resource and prefeasibility study by mid-2027 under its earn-in with Pucobre and SCM Buen Retiro. Fitzroy is evaluating a near-surface heap-leach operation supplying existing SX-EW capacity about 90 km away, targeting production from this brownfield Atacama IOCG system in 2028.

    Technical Brief

    • Four diamond rigs are operating concurrently at Buen Retiro, targeting completion of Tenorita drill-out by August.
    • Current campaign totals 78 diamond holes for 13,036 m since February, with a further 9,000 m planned in 2026.
    • Earn-in terms require delivery of a prefeasibility study by mid-2027 with Pucobre and SCM Buen Retiro.
    • Planned ownership structure envisages Fitzroy holding 70% and Pucobre 30% in the eventual project JV.
    • Buen Retiro covers 132 km² in the Punta del Cobre IOCG belt, 60 km south of Copiapó, Atacama Region.
    • The licence hosts the past-producing Manto Negro mine, which yielded 34.4 Mlb Cu between 2005 and 2009.
    • Nearby benchmark: Lundin Mining’s Candelaria mine, in the same belt, produced 145,000 t Cu in 2025.
    • March drilling (BRT-DDH045) intersected 384 m at 0.23% Cu from 4 m, supporting a large Candelaria-style system.
    • June assays included 59 m at 1.73% Cu with 12 m at 5.39% Cu, strengthening high-grade, near-surface leach potential.

    Our Take

    Buen Retiro’s shallow copper intercepts over a 1.7km Tenorita trend, combined with a 90km tie-in to existing processing, suggest Fitzroy Minerals could pursue a relatively low-capex, tolling or satellite-mine style development compared with standalone greenfield plants elsewhere in Chile’s Atacama Region.

    Pucobre’s role in the JV, alongside its ongoing underground fleet renewal in the Atacama Region reported in February 2026, indicates Buen Retiro can likely leverage an operator already investing in modern mobile equipment and local workforce, which tends to shorten ramp-up curves for near-term copper projects.

    Lundin Mining’s presence in the same Punta del Cobre iron oxide copper-gold belt and its appearance across multiple copper-price and project pieces in our database underscores that any resource definition success at Buen Retiro could be strategically relevant for larger regional players looking for bolt-on feed or district consolidation.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners
    Mining
    1 day ago

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams
    Mining
    1 day ago

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams

    South America’s Lithium Triangle holds about 64 million tonnes of identified lithium resources (43% of the global 150 million tonnes), yet geologist José Cabello’s review of 43 salt flats across Argentina, Bolivia and Chile shows that variable brine chemistry, impurities and groundwater behaviour make recovery and costs highly site-specific. Salar de Atacama benefits from ultra‑dry climate, relatively clean brines and strong logistics, while other basins such as Altoandinos, Pedernales, Hombre Muerto Oeste, Rincón, Sal de los Ángeles and Sal de Vida face tighter water and hydrogeological constraints. Direct lithium extraction (DLE) could unlock lower‑grade or impurity‑rich brines, but Cabello stresses that trade‑offs between brine withdrawal and freshwater consumption mean technology selection must be tailored to each basin’s hydrology and ecosystem.

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners
    Mining
    1 day ago

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners

    EU regulators have granted strategic status under the Critical Raw Materials Act to KGHM’s 9.5‑billion‑zloty ($2.44bn) Retków‑Grodziszcze mine and Legnica smelter conversion, unlocking faster permitting, streamlined administration and access to preferential financing. Retków‑Grodziszcze is planned to deliver over 100 million tonnes of ore by 2055, yielding about 1.5 million tonnes of copper and 5,000 tonnes of silver, while Legnica’s recycling line targets 135,000 tonnes of electrolytic copper and 250 tonnes of nickel per year. The move materially boosts EU copper and nickel recycling capacity, central to the CRMA’s 25% recycling target.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental