Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product
    Contract Award

    Epiroc order at MMG’s Khoemacau Copper Mine: fleet and automation notes for engineers

    September 1, 2026|

    Reviewed by Tom Sullivan

    First reported on International Mining – News

    30 Second Briefing

    Epiroc has secured a large underground mining equipment order from MMG Limited for the Khoemacau copper mine in Botswana, where MMG is working with Chinese contractors China Huaye and 23MCC under the ownership of China Minmetals Corp. The package is expected to include core underground production fleets such as face drilling rigs, loaders and mine trucks suited to deep, high-tonnage copper operations. For engineers, the deal signals long-term mechanised development at Khoemacau and likely standardisation around Epiroc’s automation-ready platforms and digital support tools.

    Technical Brief

    • For other deep mining projects, similar OEM–contractor–owner structures can streamline fleet standardisation and maintenance planning.

    Our Take

    With China Minmetals Corp and related Chinese contractors linked to MMG’s copper interests, this Botswana contract suggests Epiroc is maintaining strong access to Chinese‑backed project pipelines at a time when many copper developments are seeking reliable Tier‑1 OEM support for long‑life underground mines.

    Copper is one of the more frequently tagged commodities in our mining coverage, and pairing that with Epiroc’s recent acquisition of Johannesburg‑based Eventspec indicates a deliberate strategy to anchor OEM supply and aftermarket support for African copper and base‑metal mines from within the region.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 3 hours ago

    Cosmic Boy Concentrator conversion: design and tie-in notes for project engineers

    GR Engineering Services has signed an EPC contract with Myamba Minerals, a Medallion Metals subsidiary, to redesign, procure, construct and commission the conversion of the existing Cosmic Boy Concentrator in Western Australia. The brownfield plant, originally built for nickel, will be reconfigured for Myamba’s processing requirements, allowing reuse of major infrastructure rather than building a new concentrator. For project engineers, the deal signals upcoming detailed process design, tie-ins to existing utilities and structural upgrades around the grinding, flotation and tailings handling circuits.

    Mining
    about 3 hours ago

    NRW’s Karara mine extension to 2032: planning and fleet notes for engineers

    NRW Holdings’ Mining division has secured a Letter of Award extending its mining services contract at the Karara magnetite iron ore mine in Western Australia by five years, pushing the term from March 2027 to February 2032. The extension covers continued load-and-haul, drill-and-blast and ancillary mining services for Karara Mining Ltd’s large-scale, 8+ Mt/y magnetite operation, which uses high-pressure grinding rolls and magnetic separation. The longer tenure gives NRW greater certainty for fleet deployment, labour planning and maintenance scheduling across the Mid West project.

    Fixed plant reliability in the real world: condition monitoring lessons for mine engineers
    Mining
    about 4 hours ago

    Fixed plant reliability in the real world: condition monitoring lessons for mine engineers

    Crushing, conveying and screening circuits are identified as major sources of avoidable downtime in fixed plant, with bearing, gearbox and drive failures often traceable to misalignment, poor lubrication and contamination rather than design limits. A Motion–Timken webinar uses real-world case studies on crushers, screens and overland conveyors to show how condition monitoring, correct bearing selection and improved sealing can extend component life and reduce unplanned stoppages. Reliability engineers and maintenance planners are urged to focus on root-cause failure analysis and data-driven inspection intervals rather than reactive part replacement.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental