Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Safety

    Copper price record: sulphuric acid squeeze and risks for leach mines

    August 6, 2026|

    Reviewed by Tom Sullivan

    Copper price record: sulphuric acid squeeze and risks for leach mines

    First reported on MINING.com

    30 Second Briefing

    Copper prices set a fresh US record as a five‑month closure of the Strait of Hormuz and China’s sulphuric acid export ban squeeze feedstock for acid‑leach copper operations. Traders and smelters are hoarding sulphuric acid cargoes, tightening availability for heap leach and SX‑EW plants that rely on large volumes of low‑cost acid to treat oxide ores. The supply shock raises operating risks for marginal producers and could accelerate shutdowns or cutbacks at acid‑dependent mines if logistics and export flows are not restored quickly.

    Technical Brief

    • Smelters diverting acid to captive leach circuits are reducing spot availability for contract‑dependent heap leach mines.
    • Operators are revising leach schedules and stacking rates to stretch on‑site acid inventories and avoid uncontrolled production stops.
    • Emergency procurement from secondary acid producers (fertiliser, chemicals) raises variability in impurity profiles affecting leach and SX performance.
    • Site safety teams are updating contingency plans for low‑acid scenarios, including controlled curtailment to prevent unstable heaps and poor irrigation.
    • For similar leach‑based projects, dependency on single‑route acid supply is emerging as a critical design‑stage risk.

    Our Take

    Copper is one of the most heavily covered commodities in our mining database, and price spikes like this typically precede a wave of project optimisation and debottlenecking studies as operators try to unlock marginal tonnes rather than commit immediately to greenfield capex.

    The Strait of Hormuz reference is notable because very few of the 284 keyword-matched pieces on copper and sulphuric acid explicitly tie price risk to chokepoint maritime routes, signalling that logistics and security-of-supply analysis may become as material as orebody quality in project risk registers.

    Sulphuric acid’s inclusion alongside copper aligns with other safety-tagged items where acid supply and handling constraints have directly limited leach-based production, so sustained tightness here could cap output from heap leach and oxide circuits even if copper prices remain elevated.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners
    Mining
    about 23 hours ago

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams
    Mining
    about 23 hours ago

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams

    South America’s Lithium Triangle holds about 64 million tonnes of identified lithium resources (43% of the global 150 million tonnes), yet geologist José Cabello’s review of 43 salt flats across Argentina, Bolivia and Chile shows that variable brine chemistry, impurities and groundwater behaviour make recovery and costs highly site-specific. Salar de Atacama benefits from ultra‑dry climate, relatively clean brines and strong logistics, while other basins such as Altoandinos, Pedernales, Hombre Muerto Oeste, Rincón, Sal de los Ángeles and Sal de Vida face tighter water and hydrogeological constraints. Direct lithium extraction (DLE) could unlock lower‑grade or impurity‑rich brines, but Cabello stresses that trade‑offs between brine withdrawal and freshwater consumption mean technology selection must be tailored to each basin’s hydrology and ecosystem.

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners
    Mining
    about 23 hours ago

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners

    EU regulators have granted strategic status under the Critical Raw Materials Act to KGHM’s 9.5‑billion‑zloty ($2.44bn) Retków‑Grodziszcze mine and Legnica smelter conversion, unlocking faster permitting, streamlined administration and access to preferential financing. Retków‑Grodziszcze is planned to deliver over 100 million tonnes of ore by 2055, yielding about 1.5 million tonnes of copper and 5,000 tonnes of silver, while Legnica’s recycling line targets 135,000 tonnes of electrolytic copper and 250 tonnes of nickel per year. The move materially boosts EU copper and nickel recycling capacity, central to the CRMA’s 25% recycling target.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental