Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability
    Contract Award

    CIMIC–Hindustan Zinc tailings recycling project: design notes for mine engineers

    January 23, 2026|

    Reviewed by Tom Sullivan

    CIMIC–Hindustan Zinc tailings recycling project: design notes for mine engineers

    First reported on International Mining – News

    30 Second Briefing

    CIMIC Group subsidiaries Sedgman and Leighton Asia have secured separate contracts from Hindustan Zinc Limited to help deliver India’s first zinc tailings recycling facility at the Rampura Agucha Mine in Rajasthan. Sedgman will focus on process plant and tailings treatment infrastructure, while Leighton Asia will provide project delivery and construction services for the brownfield site. The project signals large-scale reprocessing of legacy zinc tailings at one of the world’s largest zinc operations, with implications for paste backfill design, tailings storage stability and metal recovery circuits.

    Technical Brief

    • Tailings recycling is expected to alter tailings rheology, influencing paste backfill mix design and pumpability envelopes.
    • Reprocessed tailings could enable partial in-pit or underground backfilling, reducing long-term surface storage volumes.
    • Similar large-scale tailings reprocessing at polymetallic mines has typically required extensive geotechnical recharacterisation of legacy deposits.

    Our Take

    Hindustan Zinc Limited showing up as the world’s largest integrated zinc producer and a top-five silver producer in our database means tailings recycling at Rampura Agucha Mines is likely to have a non-trivial impact on global secondary zinc and silver supply, not just on local waste management.

    Among the 727 Mining stories and 1403 tag-matched pieces in our coverage, relatively few combine ‘Projects’, ‘Sustainability’ and a top-ranked global producer, so this contract for CIMIC Group subsidiaries positions Sedgman and Leighton Asia as reference contractors for large-scale tailings reprocessing work in India.

    Given Rajasthan’s role in India’s base metals output, a high-profile tailings recycling project at Rampura Agucha Mines signals to other Indian operators that upgrading legacy tailings facilities can now be framed as both a production and ESG play, which may influence how future zinc and silver projects are scoped and tendered in the region.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners
    Mining
    about 2 hours ago

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams
    Mining
    about 2 hours ago

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams

    South America’s Lithium Triangle holds about 64 million tonnes of identified lithium resources (43% of the global 150 million tonnes), yet geologist José Cabello’s review of 43 salt flats across Argentina, Bolivia and Chile shows that variable brine chemistry, impurities and groundwater behaviour make recovery and costs highly site-specific. Salar de Atacama benefits from ultra‑dry climate, relatively clean brines and strong logistics, while other basins such as Altoandinos, Pedernales, Hombre Muerto Oeste, Rincón, Sal de los Ángeles and Sal de Vida face tighter water and hydrogeological constraints. Direct lithium extraction (DLE) could unlock lower‑grade or impurity‑rich brines, but Cabello stresses that trade‑offs between brine withdrawal and freshwater consumption mean technology selection must be tailored to each basin’s hydrology and ecosystem.

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners
    Mining
    about 2 hours ago

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners

    EU regulators have granted strategic status under the Critical Raw Materials Act to KGHM’s 9.5‑billion‑zloty ($2.44bn) Retków‑Grodziszcze mine and Legnica smelter conversion, unlocking faster permitting, streamlined administration and access to preferential financing. Retków‑Grodziszcze is planned to deliver over 100 million tonnes of ore by 2055, yielding about 1.5 million tonnes of copper and 5,000 tonnes of silver, while Legnica’s recycling line targets 135,000 tonnes of electrolytic copper and 250 tonnes of nickel per year. The move materially boosts EU copper and nickel recycling capacity, central to the CRMA’s 25% recycling target.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental