Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability
    Contract Award

    CIMIC–Hindustan Zinc tailings recycling project: design notes for mine engineers

    January 23, 2026|

    Reviewed by Tom Sullivan

    CIMIC–Hindustan Zinc tailings recycling project: design notes for mine engineers

    First reported on International Mining – News

    30 Second Briefing

    CIMIC Group subsidiaries Sedgman and Leighton Asia have secured separate contracts from Hindustan Zinc Limited to help deliver India’s first zinc tailings recycling facility at the Rampura Agucha Mine in Rajasthan. Sedgman will focus on process plant and tailings treatment infrastructure, while Leighton Asia will provide project delivery and construction services for the brownfield site. The project signals large-scale reprocessing of legacy zinc tailings at one of the world’s largest zinc operations, with implications for paste backfill design, tailings storage stability and metal recovery circuits.

    Technical Brief

    • Tailings recycling is expected to alter tailings rheology, influencing paste backfill mix design and pumpability envelopes.
    • Reprocessed tailings could enable partial in-pit or underground backfilling, reducing long-term surface storage volumes.
    • Similar large-scale tailings reprocessing at polymetallic mines has typically required extensive geotechnical recharacterisation of legacy deposits.

    Our Take

    Hindustan Zinc Limited showing up as the world’s largest integrated zinc producer and a top-five silver producer in our database means tailings recycling at Rampura Agucha Mines is likely to have a non-trivial impact on global secondary zinc and silver supply, not just on local waste management.

    Among the 727 Mining stories and 1403 tag-matched pieces in our coverage, relatively few combine ‘Projects’, ‘Sustainability’ and a top-ranked global producer, so this contract for CIMIC Group subsidiaries positions Sedgman and Leighton Asia as reference contractors for large-scale tailings reprocessing work in India.

    Given Rajasthan’s role in India’s base metals output, a high-profile tailings recycling project at Rampura Agucha Mines signals to other Indian operators that upgrading legacy tailings facilities can now be framed as both a production and ESG play, which may influence how future zinc and silver projects are scoped and tendered in the region.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    MAX Power–Sprott C$25m funding: Lawson hydrogen drilling lens for engineers
    Mining
    about 23 hours ago

    MAX Power–Sprott C$25m funding: Lawson hydrogen drilling lens for engineers

    MAX Power Mining has secured C$25 million from Eric Sprott via a private placement of 12.5 million units at C$2.00, each with a warrant at C$2.75, to accelerate drilling at its Lawson natural hydrogen system in Saskatchewan’s 475 km-long Genesis Trend. The company has selected three initial drill targets using 3D seismic to pinpoint structurally optimal zones for natural hydrogen and helium flow, volume and concentration, and will run a 2D seismic programme along the trend to refine additional prospects. For geoscientists and drilling engineers, the work aims to validate what MAX Power calls the world’s first large-scale commercial natural hydrogen discovery.

    Fortescue–XCMG ultra-class battery trials: duty-cycle insights for mine engineers
    Mining
    about 23 hours ago

    Fortescue–XCMG ultra-class battery trials: duty-cycle insights for mine engineers

    Testing of XCMG’s two super large battery electric prototypes for Fortescue – the XC9260BEWL wheel loader and XC9260BEWD wheel dozer – is continuing at the OEM’s Xuzhou proving grounds in China following their official unveiling in February 2026. The ultra-class units are undergoing performance and durability trials under load and duty cycles representative of Pilbara iron ore operations before being shipped to Western Australia. Results will inform battery pack configuration, thermal management and charging strategies for deployment in high-temperature, high-dust mine environments.

    Collahuasi permit setback: desalination and water-supply risks for mine planners
    Mining
    1 day ago

    Collahuasi permit setback: desalination and water-supply risks for mine planners

    A Chilean environmental court has annulled the permit for Collahuasi’s $3.2 billion desalination plant, forcing a reassessment of the seawater system that pumps desalinated water nearly 200 km from the Pacific coast to the 4,600‑metre‑elevation mine, which produced over 404,000 tonnes of copper in 2025. The decision affects an expansion intended to add 20 years of mine life and cut reliance on continental water, even though contractor Techint completed the pumping system in April. Industry leaders, including Chilean Mining Chamber president Manuel Viera, cite the case as evidence of a “cursed” regime where a single project can need 500+ permits, raising schedule and cost risk for large‑scale desalination and water‑supply infrastructure.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental