Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Blue Moon’s 33 tungsten–antimony projects: portfolio and processing lens for engineers

    August 12, 2026|

    Reviewed by Tom Sullivan

    Blue Moon’s 33 tungsten–antimony projects: portfolio and processing lens for engineers

    First reported on MINING.com

    30 Second Briefing

    Blue Moon Metals is acquiring 33 tungsten and antimony projects on BLM and Forest Service lands in the western U.S. in a US$20.5 million cash-and-shares deal, adding a 1% NSR royalty and annual holding costs of about US$162,000. The portfolio includes historic high-grade tungsten assets such as the Oregon mine in Colorado (5,000 tonnes at 14.51% WO₃) and Wildhorse Canyon in Idaho (7,461 tonnes at 0.62% WO₃) as potential direct-shipping feed to the Springer processing complex in Nevada, plus five antimony projects grading 2–10% stibnite, marking Blue Moon’s first move into antimony.

    Technical Brief

    • Consideration totals US$20.5 million, split as ~US$15.5 million in 2.8 million shares plus ~US$5 million cash.
    • Portfolio sits on Bureau of Land Management and U.S. Forest Service ground across multiple western states.
    • Springer complex in north-western Nevada is one of very few tungsten processing plants in North America.
    • Oregon mine in Colorado historically produced 5,000 tons at 14.51% WO₃ between 1907 and 1929.
    • Wildhorse Canyon mine in Idaho historically produced ~7,461 tons at 0.62% WO₃ during the 1950s.
    • Five antimony projects in the package historically report high-grade stibnite mineralisation in the 2–10% range.
    • A 1% net smelter return royalty is attached to each of the 33 individual projects.
    • Annual aggregate holding costs for the full portfolio are reported at about US$162,000 per year.
    • United States Antimony’s Thompson Falls plant in Montana is currently the only operating antimony smelter in the U.S.

    Our Take

    In our database, Blue Moon Metals’ recent acquisition of Teck American’s Apex gallium‑germanium mine in Utah and the Nussir copper‑gold‑silver project in Norway suggests a deliberate build‑out of a diversified critical‑minerals portfolio, with tungsten and antimony now added to earlier gallium, germanium and copper positions.

    United States Antimony’s ongoing operations at the Thompson Falls plant in Montana, highlighted in a separate piece on its Stibnite Hill restart, mean Blue Moon is acquiring assets tied into an existing US antimony processing footprint, which could ease near‑term offtake or toll‑treating options if any of the 33 projects advance quickly.

    With China accounting for over 80% of global tungsten production, the clustering of tungsten, antimony, gallium and germanium deals around Blue Moon in recent coverage points to the company positioning itself as a North American and European alternative supplier across several US‑ and EU‑listed critical minerals rather than a pure copper‑gold producer.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Reliable density measurement of ore slurries: process control gains for engineers
    Mining
    about 2 hours ago

    Reliable density measurement of ore slurries: process control gains for engineers

    VEGA’s MINITRAC 31 radiometric sensors are being used in Madagascar to measure ore slurry density directly from the mine, providing non-contact readings through the pipeline wall under highly abrasive laterite nickel–cobalt conditions. The system operates reliably in tropical climate extremes and with variable solids content, where conventional differential pressure or nuclear gauges struggle with scaling, wear and calibration drift. For process engineers, more stable density data supports tighter control of slurry transport, thickener performance and downstream hydrometallurgical circuits.

    Atlas Copco AIRCUBE modular compressor rooms: schedule and capex lens for mines
    Mining
    about 2 hours ago

    Atlas Copco AIRCUBE modular compressor rooms: schedule and capex lens for mines

    Atlas Copco’s AIRCUBE modular compressor rooms replace conventional stick-built compressor houses on mines, arriving as pre-engineered containerised units with integrated ventilation, electricals and controls for rapid plug-and-play deployment. Units can be craned into position on simple concrete pads, connected to existing ring mains and power within days rather than the weeks or months typical for full civil works and building construction. For brownfield expansions and remote greenfield sites, this compresses project schedules, reduces on-site trades and simplifies future capacity upgrades or relocations.

    Tembo 600K oz gold beside Barrick: project economics and mine design notes
    Mining
    about 2 hours ago

    Tembo 600K oz gold beside Barrick: project economics and mine design notes

    Lake Victoria Gold’s Tembo project in Tanzania has reported an initial resource of almost 600,000 oz. gold adjacent to Barrick’s Bulyanhulu mine, including 2.69 million indicated tonnes at 1.16 g/t and 13.33 million inferred tonnes at 1.12 g/t across the Ngula 1, Nyakagwe Village and Nyakagwe East near-surface deposits. A 5,000-metre infill drilling campaign will target Ngula 1, already drilled to about 200 m depth and hosting over half of inferred ounces, while a toll-milling deal is being advanced with Nyati Resources’ 500 t/d plant on a Tembo licence. Combined with the shovel-ready Imwelo project, expected to average 3.7 g/t in its first two years, the company is positioning for small-scale multi-asset production in Tanzania.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental