Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Antamina’s 45-strong Caterpillar 400 t truck fleet: haulage design notes for engineers

    August 4, 2026|

    Reviewed by Tom Sullivan

    Antamina’s 45-strong Caterpillar 400 t truck fleet: haulage design notes for engineers

    First reported on International Mining – News

    30 Second Briefing

    Antamina has expanded its fleet of 400 t class Caterpillar 798 ultraclass haul trucks to 45 units at its open-pit operation in the Áncash region of Peru, situated at around 4,300 m elevation. The miner has acquired 27 new 798s from dealer Ferreyros, adding to 18 existing units already in production. Operating a large, standardised 400 t fleet at high altitude will influence haul road design, pit ramp geometry, and maintenance planning for engines and braking systems under reduced oxygen conditions.

    Technical Brief

    • High-altitude operation at ~4,300 m requires derating of diesel engines and adapted maintenance intervals.
    • Reduced air density at this elevation affects retarding performance, demanding careful brake and cooling management.
    • Larger ultraclass units concentrate traffic, influencing haul road wear patterns and granular base thickness requirements.
    • Standardising on a single 400 t truck model simplifies critical spares inventory and component rebuild planning.
    • Fleet expansion of this scale typically drives upgrades to in-pit shovel capacity and crusher feed handling.

    Our Take

    Antamina’s move to a 45-unit fleet of 400‑t Cat 798s in Áncash follows its earlier adoption of the Komatsu P&H 4800XPC shovel at the same copper‑zinc operation, signalling a deliberate strategy to pair ultraclass haulage with ultra‑large loading tools for higher bench productivity.

    Ferreyros’ role in supplying 27 of these ultraclass trucks aligns with its recent deployments of Cat AI Assistant and underground autonomy in Peru, suggesting Antamina will likely be a priority candidate for advanced telematics, fleet health and autonomy‑ready configurations on the 798 fleet.

    Caterpillar’s presence in our mining coverage now spans both Antamina’s Peruvian expansion and Glencore’s large truck order with Finning in South America, indicating the OEM is consolidating its position in high‑tonnage copper corridors where haulage efficiency and OEM support are increasingly critical to cost control.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners
    Mining
    1 day ago

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams
    Mining
    1 day ago

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams

    South America’s Lithium Triangle holds about 64 million tonnes of identified lithium resources (43% of the global 150 million tonnes), yet geologist José Cabello’s review of 43 salt flats across Argentina, Bolivia and Chile shows that variable brine chemistry, impurities and groundwater behaviour make recovery and costs highly site-specific. Salar de Atacama benefits from ultra‑dry climate, relatively clean brines and strong logistics, while other basins such as Altoandinos, Pedernales, Hombre Muerto Oeste, Rincón, Sal de los Ángeles and Sal de Vida face tighter water and hydrogeological constraints. Direct lithium extraction (DLE) could unlock lower‑grade or impurity‑rich brines, but Cabello stresses that trade‑offs between brine withdrawal and freshwater consumption mean technology selection must be tailored to each basin’s hydrology and ecosystem.

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners
    Mining
    1 day ago

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners

    EU regulators have granted strategic status under the Critical Raw Materials Act to KGHM’s 9.5‑billion‑zloty ($2.44bn) Retków‑Grodziszcze mine and Legnica smelter conversion, unlocking faster permitting, streamlined administration and access to preferential financing. Retków‑Grodziszcze is planned to deliver over 100 million tonnes of ore by 2055, yielding about 1.5 million tonnes of copper and 5,000 tonnes of silver, while Legnica’s recycling line targets 135,000 tonnes of electrolytic copper and 250 tonnes of nickel per year. The move materially boosts EU copper and nickel recycling capacity, central to the CRMA’s 25% recycling target.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental