Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Acquire–Blackfox–GIM Suite integration: data quality gains for drill planning

    July 29, 2026|

    Reviewed by Joe Ashwell

    First reported on International Mining – News

    30 Second Briefing

    Acquire Technology Solutions has released an integration linking Blackfox drilling management with GIM Suite, enabling direct transfer of drillhole data between the two platforms. Hole collar details and related drilling information now flow automatically rather than via manual imports, reducing transcription errors and version conflicts in exploration databases. For geologists and drill planners, this should shorten drill programme initialisation times and tighten QA/QC on collar coordinates, depths and metadata across planning, execution and geological modelling workflows.

    Technical Brief

    • Similar connectors between operational drilling platforms and centralised geological databases are becoming standard in multi-rig exploration hubs.

    Our Take

    For operators, tighter coupling of geology and drilling records at the platform level typically reduces manual reconciliation effort and data latency, which can materially improve resource model updates and short-interval control on active projects.

    Vendors like Acquire Technology Solutions that can sit between multiple data sources are increasingly positioned as ‘system-of-record’ candidates on multi-mine portfolios, giving them more influence over how geoscience workflows are standardised across sites.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    LiuGong Indonesia all‑electric equipment plant: supply and haulage impacts for mines
    Mining
    about 3 hours ago

    LiuGong Indonesia all‑electric equipment plant: supply and haulage impacts for mines

    LiuGong has broken ground on its Indonesia Green Smart Industrial Park at the Karawang Artha Industrial Hill Industrial Estate in West Java, billed as the country’s first all‑electric heavy equipment factory. The plant will focus on battery-electric construction and mining machinery, positioning production close to Indonesia’s nickel and battery supply chain and major coal and mineral operations. For mine operators, local assembly of electric excavators, loaders and haul units should cut import lead times and support regional trials of high‑capacity battery systems in humid, high‑temperature conditions.

    Pilbara Ports’ record iron ore year: capacity and reliability notes for engineers
    Mining
    about 3 hours ago

    Pilbara Ports’ record iron ore year: capacity and reliability notes for engineers

    Pilbara Ports handled a record 804.1 million tonnes of trade in the 2025–26 financial year across Ashburton, Dampier, Port Hedland and Varanus Island, passing the 800‑million‑tonne mark for the first time and retaining its status as the world’s largest bulk export port. Iron ore shipments from the Pilbara dominated volumes, confirming sustained high utilisation of deep‑water berths, shiploaders and channel capacity. The scale signals ongoing demand for high‑throughput stockyard management, dredging, and rail‑to‑port interface reliability across the network.

    Never Never ramps up for Ramelius: planning and processing notes for gold engineers
    Mining
    about 3 hours ago

    Never Never ramps up for Ramelius: planning and processing notes for gold engineers

    Ore production at the Never Never underground mine in Western Australia more than doubled to 115,000 tonnes in the June quarter, with head grade lifting to 5.95g/t as Dalgaranga completed its first full quarter supplying Ramelius Resources’ Mt Magnet processing hub. The ramp-up helped drive group gold output to 53,466oz, signalling stronger mill feed quality and higher throughput at the central plant. For mine planners and metallurgists, the combination of increased tonnage and grade at Never Never will influence stope sequencing, backfill scheduling and processing blend strategies across the Mt Magnet–Dalgaranga circuit.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy